Posted 18 June 2012 - 12:33 PM
In this case (2 Av line to 125 St) it's not possible, since there would be nowhere for the trains to go once they hit 125 St. If there were a yard there, sure, it would work. Without one, it's impossible.
Please mind the gap between the train and the platform.
#602
Posted 18 June 2012 - 04:21 PM
BTW, heres a few pics from friday at the 63rd/Lex station. I always knew that if SAS was ever built, the wall on the platform side was coming down, but i never expected the whole station to get gutted!



The last remaining 'red' i could find at the time:



The last remaining 'red' i could find at the time:
Everywhere else, Im "9of13".......Resistance Is Futile
#603
Posted 18 June 2012 - 04:29 PM
Lex-63 just looks so much worse. And to think I used to like that station...

Lance is my favorite mod... Hands down.
Y u no nice?
#604
Posted 18 June 2012 - 04:49 PM
Damn, that was quick!
You can subscribe to my Youtube Channel at http://www.youtube.com/GojiMet86 and check my photos at http://s978.photobuc...ofile/GojiMet86.
#605
Posted 18 June 2012 - 04:55 PM
Let's see what they put to replace the red tiles.
Please mind the gap between the train and the platform.
#606
Posted 18 June 2012 - 05:11 PM
I have never seen that side of Lexington Av/63 St, I always noticed the bricks. I guess now I know why everyone thinks that it is a terrible station now.

Lexington Av Express
Credit to R188 7857 or Casey Stengel
#607
Posted 18 June 2012 - 05:22 PM
You're still looking at the same old side of the station as always, it's just that the red tiles on all sides have been removed, not just on the side of the new platform. The new platform is sealed off by those blue construction walls.
Edited by Mysterious2train, 18 June 2012 - 05:23 PM.
The MTA reallyyyy shouldn't move the B44 LTD from New York Av to the less busy Rogers Av for SBS service. I want M101 SBS, also visit my small site. If you don't like my lame forum handle, you can call me Austin.
#608
Posted 18 June 2012 - 05:53 PM
It's not really a newplatform behind the wall. It was always there just without the tiles.
Everywhere else, Im "9of13".......Resistance Is Futile
#609
Posted 19 June 2012 - 12:21 AM
its back to its roots before the 1960s tiles .
#610
Posted 19 June 2012 - 07:44 PM
It's not impossible but look at the costs and delays we've had with this pared down SAS already.Now add the cost of a TBM and underpinning to the mix. Billions of dollars more in cost and the express tracks of the SAS will end up costing more than the present project IMO AND take longer to complete.It's not impossible. It's just a whole lot easier to do before the line opens than it would be after the fact. Besides, that's exactly how the Sixth Avenue express tracks came to be. The local tracks were installed adjacent to the PATH tracks between 34th Street and W 4th Street in the 1930s. The express tracks were built in the '60s underneath the PATH tracks as well as the local 6th Avenue ones.
#611
Posted 19 June 2012 - 07:54 PM
Oh I know that. I was simply speaking on the feasibility of such an idea, not that it would obviously cost more than the line is costing right now. That's why I said that it's easier to build a bi-leveled line when it's done from the get go and not as an afterthought.
#612
Posted 01 July 2012 - 10:29 AM
How frequently are they going to run the
during rush hours once phase I is complete? Every 4 minutes as opposed to 6? Are they going to be running the
at that point as well or after they complete another phase? I forgot whether they will have a place to terminate the
once phase one is done; it does not appear that they do. How frequently will that line run?
#613
Posted 01 July 2012 - 10:31 AM
How frequently are they going to run the
during rush hours once phase I is complete? Every 4 minutes as opposed to 6? Are they going to be running the
at that point as well or after they complete another phase? I forgot whether they will have a place to terminate the
once phase one is done; it does not appear that they do. How frequently will that line run?
The

Sign by RTS CNG Command.
#614
Posted 01 July 2012 - 10:35 AM
I think Phase 3 and 4 should be constructed the way the 8th Avenue line is north of 59th Street. It won't cost that much more, and the space is there for future express tracks. 72nd Street & 125th Street would be express stations, they would be single level.

Sign by RTS CNG Command.
#615
Posted 01 July 2012 - 01:49 PM
@ those 63rd-Lex pics, wow! Sure looks a lot different without the false walls. I kinda liked it and hope they are reassembled somewhere else. Even those orange tiles/bricks would've been nice than the bland white tiles at Wall St.
"Nasa spends millions to make a pen work in space, while the Russians just uses a pencil."
#616
Posted 02 July 2012 - 09:52 AM
Probably they are gonna put in Trains from Coney Island Yard and/or Piktin Yard and put in these trains from Grand Street and then go to Harlem and continue running round trips the full route.How would the trains get back to where they came from? There's no yard on either end of the line.
UPDATE: I'm putting a new gallery featuring pictures of buses I shot. Here's the link:http://transitjeopar...te-gallery-pics .To be fully complete, it might take several months,as I have a lot of photos and I am trying to get them all into the gallery (over 1,000). Be patient, enjoy what I have, and come back each day to see more pictures
#617
Posted 02 July 2012 - 01:07 PM
I believe there will,be a yard at 125 Stepreet and the
will be most likely R179s or R212s

Lance is my favorite mod... Hands down.
Y u no nice?
#618
Posted 02 July 2012 - 01:09 PM
I believe there will,be a yard at 125 Stepreet and the
will be most likely R179s or R212s
As the resident grammar nazi, I must correct this post:
I believe there will be a yard at 125th Street and the
And no, it's based out of Jamaica b/c there is a connection to 63rd Street in the plans. Why build a new yard?

Sign by RTS CNG Command.
#619
Posted 02 July 2012 - 01:18 PM
You are both getting ahead of yourselves. Phase 2 isn't even in its construction phase. Plus a yard doesn't have to be big, there's the 137th st yard for the
. I don't see why the SAS phase 1&2 would need to store trains all the way over at JYd.
Edited by Grand Concourse, 02 July 2012 - 01:19 PM.
"Nasa spends millions to make a pen work in space, while the Russians just uses a pencil."
#620
Posted 02 July 2012 - 01:19 PM
As the resident grammar nazi, I must correct this post:
I believe there will be a yard at 125th Street and thewill most likely by R179's or R211's.
And no, it's based out of Jamaica b/c there is a connection to 63rd Street in the plans. Why build a new yard?
Ugh. Getting Cars to the

Lance is my favorite mod... Hands down.
Y u no nice?