Took the (5) to Pelham Parkway (Dyre) today and I noticed two things the 1st was construction of a major structure south of the Morris Park stations and switches and second was the extension of the north bound express tracks into and beyond the Pelham Parkway seems like it's almost to the tunnel portal going towards Gunhill. Anyone know if there going to extend trackage  all the way to Dyre? and if so why?

 

R3 

Link to comment
Share on other sites


Took the (5) to Pelham Parkway (Dyre) today and I noticed two things the 1st was construction of a major structure south of the Morris Park stations and switches and second was the extension of the north bound express tracks into and beyond the Pelham Parkway seems like it's almost to the tunnel portal going towards Gunhill. Anyone know if there going to extend trackage  all the way to Dyre? and if so why?

 

R3 

 

I believe the express tracks were taken out north of Pelham Parkway when the TA bought the NYW&BR. They readded the southbound express track around the late 1990s or early 2000's in order to do subway car tests. As far as I know, there are no plans to revive the Northbound Express track at this time.

 

Link to comment
Share on other sites

http://i1374.photobucket.com/albums/ag405/ace925/6AFEAE88-8EC4-49DA-8D64-2A679AC7B251_zps31jqzuas.jpg~original

 

Here's what I was referring to this is the North bound platform at Pelham Parkway station with a new express trackbed leading almost to the tunnel portal. The track used to end just south of the station. Now it's four track.

Link to comment
Share on other sites

http://i1374.photobucket.com/albums/ag405/ace925/6AFEAE88-8EC4-49DA-8D64-2A679AC7B251_zps31jqzuas.jpg~original

 

Here's what I was referring to this is the North bound platform at Pelham Parkway station with a new express trackbed leading almost to the tunnel portal. The track used to end just south of the station. Now it's four track.

 

Pelham Parkway was like that for a while I believe. But the track doesn't continue to Dyre Avenue and is not likely to.

Link to comment
Share on other sites

Pelham Parkway was like that for a while I believe. But the track doesn't continue to Dyre Avenue and is not likely to.

Maybe so.. Havnt been that way in ages. just saw work trains and tracks sections on flatbeds. I do remember a year or two ago the tracks ending just shy of the PP Station the tracks now extend to the Mace ave tunnel portal. I might have to go that way again. ill check it out in more detail.

Link to comment
Share on other sites

for some reason my post didn't come through the whole way. If possible may you take pics and post them, thanks/

Yep no problem I did find out part of whats going on. There doing a signal modernization and rebuilding the interlocking south of Morris Park and Dyre ave Stations. But they did extend the track northward.

Link to comment
Share on other sites

It is said in Peter Dougherty's "Tracks of the NYC Subway", that the Dyre express tracks are being used for CBTC testing. This could possibly be for a future IRT line. Maybe the initial testing for the (7) is going to be here before working on the middle express track?

 

-A

its not for a future line, its for testing like you said. There is also CBTC on the Culver express tracks

Link to comment
Share on other sites

Oh, yeah. I'm sorry I wasn't clear enough---I did mean that the testing on the Dyre express track could be for a future CBTC-capable IRT line (Like if they gave it to the West Side IRT or something).

 

-A  :ph34r:

 

P.S. I didn't know they were testing on the Culver express. Perhaps they should utilize the West End express too? 

Link to comment
Share on other sites

  • 4 weeks later...

Hate to beat a dead horse. Got a chance to ride in  Old W&B territory again. 3rd rail is installed on the Northbound track. Y4? All the way to the tunnel portal. I also noticed they cleared and flattened the trackbed beyond the end of the rails. Seems like they installed some type of wiring  under this could be for the CBTC? it would seem maybe there going to extend trackage atop and almost to Baychester Ave for CBTC testing?

Could also be just upgrading the general signal system for the Dyre Ave Line remains to be seen?

Here's some photo's. @ Pelham Pway and GH

 

http://i1374.photobucket.com/albums/ag405/ace925/1EEFF672-39A5-4379-9829-1C5E315A67BA_zpsxayjtulk.jpg~original

http://i1374.photobucket.com/albums/ag405/ace925/04275ADB-8591-4235-B687-D8AC5E2B6E2F_zpspkww1so2.jpg~original

http://i1374.photobucket.com/albums/ag405/ace925/765D2761-1AF2-45B3-A2BA-490DCD4958F5_zpse5txug00.jpg~original

http://i1374.photobucket.com/albums/ag405/ace925/C840D3B4-A8F4-4BD7-B74B-45A592068D22_zpss1aiwz47.jpg~original

Link to comment
Share on other sites

I would imagine with the new tracks that they will be used for regular service often as(everyday) which may cause the (5) to bypass certain stops. I mean the Dyre stations aren't the greatest looking. Aside from testing also, theres other places IRT trains get tested such as the Rockaways, Sea Beach, Culver, West End etc.

Link to comment
Share on other sites

I would imagine with the new tracks that they will be used for regular service often as(everyday) which may cause the (5) to bypass certain stops. I mean the Dyre stations aren't the greatest looking. Aside from testing also, theres other places IRT trains get tested such as the Rockaways, Sea Beach, Culver, West End etc.

If you mean GOs, then yeah. Otherwise they would still be used for testing. Nothing would really change since Dyre Avenue isn't actually an express line anymore.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.