R3216068E Posted May 24, 2015 Share #1 Posted May 24, 2015 http://newyork.cbslocal.com/2015/05/21/mta-second-avenue-subway/ The MTA is offering strap hangers to take a look at the second ave subway I'm going to go take a look at how far they have gotten to completing the construction of the line the train is returning to the city and the might return as well Link to comment Share on other sites More sharing options...
ttcsubwayfan Posted May 24, 2015 Share #2 Posted May 24, 2015 The train won't exist until the entire SAS is done. The article clearly says that it'll just be the rerouted serving the first portion of the project. And given how long it has taken them to get this far, I don't have any hopes for seeing the in my life time. Also, there is no such word as "glamps". Link to comment Share on other sites More sharing options...
Fresh Pond Posted May 24, 2015 Share #3 Posted May 24, 2015 The train won't exist until the entire SAS is done. The article clearly says that it'll just be the rerouted serving the first portion of the project. And given how long it has taken them to get this far, I don't have any hopes for seeing the in my life time. Also, there is no such word as "glamps". The isn't coming online until phase 3 (63 to Houston) is built. Probably not until 2643 lol Link to comment Share on other sites More sharing options...
Javier Posted May 24, 2015 Share #4 Posted May 24, 2015 I think you mean 3643 lol. Link to comment Share on other sites More sharing options...
R3216068E Posted May 24, 2015 Author Share #5 Posted May 24, 2015 The train won't exist until the entire SAS is done. The article clearly says that it'll just be the rerouted serving the first portion of the project. And given how long it has taken them to get this far, I don't have any hopes for seeing the in my life time. Also, there is no such word as "glamps". It was a typo and if the MTA really focuses on the construction and gets the work done without any delays then will be done and there will be less overcrowding on the Lexington ave line Link to comment Share on other sites More sharing options...
ttcsubwayfan Posted May 24, 2015 Share #6 Posted May 24, 2015 The isn't coming online until phase 3 (63 to Houston) is built. Probably not until 2643 lol Huh, I could have sworn it was phase 4. Doesn't matter though, it's still gonna take forever, haha. It was a typo and if the MTA really focuses on the construction and gets the work done without any delays then will be done and there will be less overcrowding on the Lexington ave line Sure, but what leads you believe that the MTA is capable of doing so? The SAS has been in the works for a long time now, and the line extension should have been open by now. Link to comment Share on other sites More sharing options...
MysteriousBtrain Posted May 24, 2015 Share #7 Posted May 24, 2015 Huh, I could have sworn it was phase 4. Doesn't matter though, it's still gonna take forever, haha. Sure, but what leads you believe that the MTA is capable of doing so? The SAS has been in the works for a long time now, and the line extension should have been open by now. Yeah but ever since 2008 I believe, the 2 avenue project was not pushed back, so I have a bit of hope. On the other hand, the extension was pushed back so much I lost count of it. Link to comment Share on other sites More sharing options...
R3216068E Posted May 25, 2015 Author Share #8 Posted May 25, 2015 Yeah but ever since 2008 I believe, the 2 avenue project was not pushed back, so I have a bit of hope. On the other hand, the extension was pushed back so much I lost count of it. Well the line should be CBTC next year I think then there will be an extension it's kind of sad because once the is CBTC it's goodbye to the R62as on the Huh, I could have sworn it was phase 4. Doesn't matter though, it's still gonna take forever, haha. Sure, but what leads you believe that the MTA is capable of doing so? The SAS has been in the works for a long time now, and the line extension should have been open by now. yeah they are going to do the CBTC on the first before they make an extension for the I'm pretty sure the SAS has alot more to worry about right now Link to comment Share on other sites More sharing options...
CenSin Posted May 25, 2015 Share #9 Posted May 25, 2015 I think you mean 3643 lol.You're missing a digit there, Javier. Link to comment Share on other sites More sharing options...
Roadcruiser1 Posted May 26, 2015 Share #10 Posted May 26, 2015 One thing is for certain. When the Second Avenue Subway is done it did be over the year 11,000. . Link to comment Share on other sites More sharing options...
trainfanrod Posted May 27, 2015 Share #11 Posted May 27, 2015 the MTA needs to get it together the population in NYC is growing fast Link to comment Share on other sites More sharing options...