Enhanced Station Initiative


Recommended Posts

(Can we get this pinned as a general thread for the ESI, now that the ESI is moving into the second package and preparing for the third?)

 

This month's Capital Program meeting delves into more detail on the ESI (Enhanced Station Initiative)...

 

As you already know, 53rd Street has already closed, Bay Ridge Av will close April 29th and Prospect Avenue will close June 5th.

 

The RFP for "Package 2" was awarded April 14th, and I assume it will start sometime in the fall/winter.

 

The RFP for "Package 3" is being prepared and will go out in the next few months.

 

18034165_304620749971399_730218566632620

 

18034334_304621066638034_172292946978336

Link to comment
Share on other sites


  • Replies 782
  • Created
  • Last Reply

Finally Central Park West stations get some attention. 72nd and 86th Street are incredibly disgusting. They need an elevator or escalator at those stations too. Those stairs are a B.

 

I would definitely agree there. 81 Street is the class of that line and the rest are not up to snuff.

Link to comment
Share on other sites

What's so different about ESI vs previous station renovations? USB ports and LED screens?

 

And is this faster than normal station renovation? And if so, why is that?

 

Yeah basically. The idea is that the station is closed for six months and the renovation is a design-build contract. There is also improved signage on street level and in the station and new covered entrances.

Link to comment
Share on other sites

Huh, they're going to rehab Richmond Valley on the SIR. I wonder if they're going to lengthen the platforms to 300 feet...

 

I'd love to see them do that but it would require an overpass to be completely removed, as there are two staircases at each end of the station which take up the full width of the platform. The ROW is also not wide enough to move the stairs further away from the tracks.

Edited by Around the Horn
Link to comment
Share on other sites

I'd love to see them do that but it would require an overpass to be completely removed, as there are two staircases at each end of the station which take up the full width of the platform. The ROW is also not wide enough to move the stairs further away from the tracks.

Actually, no. The overpass at the north end wouldn't conflict with a potential platform extension.

Link to comment
Share on other sites

(Can we get this pinned as a general thread for the ESI, now that the ESI is moving into the second package and preparing for the third?)

 

This month's Capital Program meeting delves into more detail on the ESI (Enhanced Station Initiative)...

 

As you already know, 53rd Street has already closed, Bay Ridge Av will close April 29th and Prospect Avenue will close June 5th.

 

The RFP for "Package 2" was awarded April 14th, and I assume it will start sometime in the fall/winter.

 

The RFP for "Package 3" is being prepared and will go out in the next few months.

Would the Package 3 rehabs mean R.I.P. to the IND mosaic tiles?

 

Take a closer look at Manhattan and the Bronx. 28 St, 3 Av-138 St, E 149 St, Brook Av and Westchester Sq on the (6), Pelham Pkwy on the (5), and 145 St on the (3).

IINM 34 St-Penn Station on the IRT side will be included as well at some point... Edited by paulrivera
Link to comment
Share on other sites

I also created a thread on this. Moderators, could that thread be merged in here?


Are they planning to "re-open" the 163rd St Station? The north half is closed essentially

 

That is one of the most disgusting stations on the subway system. It smells like an uncleaned bathroom.

Link to comment
Share on other sites

This topic is now pinned. Please refrain from straying off-topic.

 

Looking at phase 2, I really hope they don't intend on closing all those Astoria stops at the same time. The local buses will not be able to handle the crowds trying to connect with the (N) and (W) at Queensboro Plaza or Astoria Blvd. Not to mention it really throws off the passenger distribution at those two stations.

Link to comment
Share on other sites

This topic is now pinned. Please refrain from straying off-topic.

 

Looking at phase 2, I really hope they don't intend on closing all those Astoria stops at the same time. The local buses will not be able to handle the crowds trying to connect with the (N) and (W) at Queensboro Plaza or Astoria Blvd. Not to mention it really throws off the passenger distribution at those two stations.

Shuttle buses are a must. The Q102 can't even handle 10% of the ridership, and the (MTA) can't in good conscience expect to have people wait 30 minutes for a Q102 or walk to the Q100 to the west or Q101 to the east.

 

I doubt they'll close all the El stations at the same time though.

Link to comment
Share on other sites

Shuttle buses are a must. The Q102 can't even handle 10% of the ridership, and the (MTA) can't in good conscience expect to have people wait 30 minutes for a Q102 or walk to the Q100 to the west or Q101 to the east.

 

I doubt they'll close all the El stations at the same time though.

I hope so, but the way they are handling BMT 4th Avenue is not promising...

Link to comment
Share on other sites

Looks like the 4th Ave stations are all being closed simultaneously. Will this also be the case for the Astoria Line stations (since they are all local stations)?

 

Additionally, how will the MTA deal with awarding packages to stations that are the only ones on their respective lines to be renovated under ESI? For instance, 28 St (6) (only station on Lex Av Line), 145 St (3) (only one on Lenox Line), Pelham Pkwy (5) (only one on Dyre Av Line).

 

Finally, I'm curious how the MTA will handle the 23 St (F)(M) renovation, since they have to keep the entrances open for the PATH, unless the PATH stations are somehow shut down too...

Edited by agar io
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.