LGA Link N Train Posted August 22, 2017 Share #1 Posted August 22, 2017 The current second Avenue is being built with only 2 tracks on the main line with only a few connections and is very expensive, so how can it be better integrated with the current system and what Connections need to be adressed???? Sent from my SM-G386T using Tapatalk Link to comment Share on other sites More sharing options...
RES2773 Posted August 22, 2017 Share #2 Posted August 22, 2017 The current second Avenue is being built with only 2 tracks on the main line with only a few connections and is very expensive, so how can it be better integrated with the current system and what Connections need to be adressed???? Sent from my SM-G386T using Tapatalk I posted this pretty much in the forum that already exists for this topic at the same time. Let's not create another one. Can we discuss in the existing one? Sent from my iPhone using Tapatalk Link to comment Share on other sites More sharing options...
LGA Link N Train Posted August 22, 2017 Author Share #3 Posted August 22, 2017 Ok Sent from my SM-G386T using Tapatalk Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.