Jump to content

limitednyc

Veteran Member
  • Posts

    979
  • Joined

  • Last visited

Everything posted by limitednyc

  1. If that's the case why does the dot still operate the si ferry?
  2. Isn't aeb artic electric busses. If So then why would ch be getting artics?
  3. Makes sence they want to in implement the changes in 1/25.
  4. Maybe just have the rockerway ferry make a stop on Sheepsheadbay ?
  5. Thanks it was designed for Padgett basin and Seaview to be a downtown bk version of the bm2.
  6. Referring to the connected post about the b103
  7. How do u do that. Also people know but can't afford.
  8. Do these orders tell us that we are at the end of the xn era.
  9. It's back to to the future, just like the 1990's when nyct was all RTS.
  10. 100 percent true. Also spoke to a up driver who told me only 1/3 of new highers make it through training and probation.
  11. 100 percent true. Also spoke to a up driver who told me only 1/3 of new highers make it through training and probation.
  12. It happens me all the time on the B36. But also lack of supervision is a problem, that causes bus bunching.
  13. All thats needed is ro operate the service as as scheduled. But it is time to revise most routes for running time and riding?
  14. The problem with the q25 cp is all at gas lcl's.
  15. Only during peak school riding , all they have to do in run all scheduled service on time .
  16. I forgot that the B15 was being trunkcated in the draft plan.
  17. Also the b15. Coul d see the b41. And for the resigns with the reconstruction of jam with expansion the new merrick blvd. In Brooklyn what ever happen with the combination of the B6/103. Mabe the b46 lcl.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.