Basically you have to train everyone (from the dispatchers, tsses to the T/Os and C/rs) as this is considered a new train with different types of systems (TOD screens, powertrain/braking) and with Pitkin this is considered the first NTT training (besides the 160s). So it will take time for them to get the stuff together and to the next phase of testing.