Jump to content

SubwayFan3000

Senior Member
  • Posts

    368
  • Joined

  • Last visited

Everything posted by SubwayFan3000

  1. R211s are replacing all R46s and R44s, new R211 cars would be produced and delivered at a rate of 30 to 40 cars per month.
  2. http://web.mta.info/mta/news/books/pdf/190122_1400_CPOC.pdf read this at page 29 It says the first R211A test train was scheduled to be delivered in July 2020, In Close coordination in conjunction with the installation of CBTC on the IND Queens Boulevard Line, which must provide the on-board equipment, mock-ups, drawings and other technical information for Kawasaki’s use, is required in order to insure on time delivery of the Initial Train in July 2020, Thereafter, new R211 cars would be produced and delivered at a rate of 30 to 40 cars per month. Which This Means Jamaica Yard will be receiving R211s for CBTC in QBL and Return/Swap all R160s back to Coney Island Yard.
  3. Actually Congress Passed More than 400 Bills about Voting Rights, Election Security, Universal Healthcare, Progressive Tax, Increase Corporate Tax, Free Education, Green New Deal, Eliminating National Debt and etc but the Senate under Mitch McConnell had blocked all of it, Also Candidates like Bernie Sanders and Elizabeth Warren are the ones who are more addressing issues like you said wealth gap, poor quality of K–12 education, crumbling infrastructure, high cost of college education, anxiety about jobs like upcoming automation, Amazon and other e-commerce, anxiety about medical costs, climate change and national spending and debt, They both Promised/Vowed to Cancel Student Debts, Free Education, Universal Healthcare, Universal Childcare, Progressive Tax, Increase Corporate Tax, Job Guarantee, Breaking up Big Tech Corporations like Amazon, Facebook and Walmart, Modernizing US Infrastructure, Combating Climate Change and etc. Also Keep in Mind that 20% of Bernie Supporters had voted for Trump in 2016 because Hillary was a Terrible Candidate.
  4. MTA should put CBTC on Astoria Line and Second Avenue Line instead of QBL, Asotria and Second Avenue Line are Slow AF.
  5. Hello Everyone, Who is gonna win 2020 presidential election? to me, i do not want that Orange Face MF Donald Trump to win Re-Election, I Want him to lose.
  6. The Swap has got to stop ASAP, R160s should return to CI Yard, R46s should be stayed in Jamaica until R211s came to service in 2021 plus CBTC in QBL is fully completed by that time.
  7. Yeah I'm Always Wrong, I Knew Corruption and Bureaucracy of Cuomo's MTA likes to destroy NTTs that were on the line since the beginning.
  8. They should stop the Fleet Swaps and Bring Back the R160s to CI Yard, I Guess that is a reason why Byford resigned because of fleet swaps between CI Yard and Jamaica.
  9. I Don't agree with fleep swap, but he must wait until R211s come in around Q3/Q4 2020 to Q1/Q2 2021 and replace all R46s, then there is possibility that R160s will come back to the
  10. R262 R142 R262 R142/142A R142 R262 R188 R211, R179 R211 R179, R211 R211, R160 R160 R211, R160 R160, R211 R160, R179 R143, R160 R160, R211 R160. R211 R211, R160 R262, R160, R211 R211 (SIR) R211S
  11. You're all being bunch of bullies, STOP! Leave @darkstar8983 Alone and he have right to express his own opinion as much as i do.
  12. then why 30 R211 Cars have been built? Does these tweets sound familiar?
  13. R211s are gonna be on service around Q3-Q4 2020.
  14. It is all Corruption, Lobbyism and Bureaucracy is the reason why MTA cannot let subway "be free".
  15. Yes, R179s are expected to replace all R42s.
  16. I Reported You to the Admin for Cyberbullying and Harrasment!
  17. It would be Awesome for Astoria Line to have CBTC Because Trains in Astoria Line are Slow AF.
  18. They're both Same S***! Cuomo is not even a Real Democrat but a Closeted Republican.
  19. This is Unbelievable, Smh! Cuomo, CEO of MTA and all Corrupted Lobbyist Albany Officials are the ones needs to be resigned.
  20. It is a Swap due to a Testing for the QBL CBTC, They might Re-Swap it back when R211s are on Service or Testing on QBL CBTC Fails.
  21. What if Elevated are Closed for Demolition and Reconstruction due to Crumbling Elevated Lines?
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.