With my plans, Broadway Express would receive CBTC first; and is probably priority for CBTC along that trunk. It’d make sense, as I’d send the up to 96th street (as you suggested). I wish they made an express track ( SA Express, SA local) but they didn’t. So my plans changed. Either we axe the or send it to continental, and send the to Astoria.
Phase A of deinterlining:
The easiest deinterlining would be done by flipping the and ‘s northern terminuses.
Phase B of deinterlining:
Now that we have the going to Astoria, there’s no need for a second line going there. We can send the to Second Avenue, as SAS can handle 40 TPH at max. The would now run full time express.
Phase C of deinterlining:
This part is optional, and would lose riders their one seat ride. But, I’m going to share it anyway.
via 4th Ave local, to Bay Ridge-95th Street
via 4th Ave express, via Sea Beach, to Coney Island
via Brighton Express, to Brighton Beach
via Brighton Local, to Coney Island
via West End, to Coney Island
Fleet assignments and TPH:
: R211; 15 TPH
: R211; 15 TPH
: R160; 16 TPH
: R160; 16 TPH
: R68; 13 TPH
: R211; 13 TPH
(THIS WOULD BE DONE AFTER BROADWAY EXPRESS GETS THE GREENLIGHT+ R68S ARE PHASED OUT)