Hello all, I went to the S&D on 3/19/2023 and supposed to take the test on 4/23 and was studying for the test. However I took the train operator test for the MTA NYC transit back in June of 2017 and was just officially appointed on 3/31 as a train operator for the MTA NYC transit. Not sure if I should still take the test even though I saw NYCT pays more at the beginning than LIRR or should I reach out to LIRR and withdraw my application and stick with NYCT. Any advise would be good.