trainfan22

Recommended Posts

what is the point of the r143 they only bought them for the L line and it wasnt even enough cars because of overcrowding and they had to buy 3 sets of r160 coundt they left the L line with the r42 it had and never orded the r143 and just made the whole eastern divison with r160s

Link to comment
Share on other sites


When the MTA ordered the R143s, they didn't see the demand for alot more service coming, so basically the order was underestimated. Now, with the R160s to supplement the R42s replaced, those are in. Now, the other plan the MTA wants to do with the R160s on the (L) is that the MTA wants to add 8 more trains during peak hours.

Link to comment
Share on other sites

The point of the R 143's was to be only used for the L Line since those cars were needed as part or the ATO/CBTC/OPTO Project. However the fact they didn't order enough trains slowed down the Project. The L Line is a test line for the future. Whatever works on the L Line will expand to other lines. They got 5 sets of R 160's on the L Line and once they get them on line with CBTC will see the finished product including ATO. When the TWU sells us out on OPTO the L Line will be 100% OPTO at ALL TIMES.

Link to comment
Share on other sites

It was not a pointless order. The MTA was suffering from a car shortage in the B division when the R143 were delivered. The R143 order didn't retire any cars, but moved them to other yards where they were needed.

 

Not to mention that without the R143, the R160 would be a mroe expensive order and it would take longer to get the bugs and glitches out of the programming, from lack of experience.

Link to comment