Jump to content
Attention: In order to reply to messages, create topics, have access to other features of the community you must sign up for an account.
Sign in to follow this  
Forest Glen

Construction of New DC Metro line Begins in Tysons Corner

Recommended Posts

A 23 mile extension of the DC Metro to Dulles Airport is being built. It will be completed in 2013. The extension is being built under the congested route 123. The extension is partially being funded by federal stimulus cash. Some sections of the tunnel are being built by the old fashioned cut and cover method. Other sections are being built with tunnel boring machines

 

Credit given to Subchat's Sand Box John for posting the article

 

http://www.washingtonpost.com/wp-dyn/content/article/2009/10/17/AR2009101700716.html

Share this post


Link to post
Share on other sites

I am very happy this line was fit into the budget, and with stimulus aid dollars not a pay or service cut.

 

- A

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.