Is CBTC being installed on the (7) line?


NYtransit

Recommended Posts

apprently for 1 year theres been major G.O's on the (7) line. such as,the (7) line being cut from 61st to main street,the elminating manhattan (7) local during PM rush. and chnaging up the 3rd rails.does this mean that all this work if for installition of CBTC on the flushing line? or its getting ready to instill CBTC on the flushing line?

Link to comment
Share on other sites


It does help to have nicely set up rails and such when they start going over the line to put up the necessary equipment for CBTC.

 

New rails are nice but not needed. The CBTC transponders are placed on ties and other equipment is places in side rooms or cabinets along the RoW.

Link to comment
Share on other sites

you kidding? look how long it took them to get the (L) CBTC ready...

and with all the budget constraints and stuff... even if all the signalling equipment was in place, the R188's would still be a few years off...

 

ya but thats because there was a bug.and they said that they figured out the bug.so it should be quizker started up cbtc on the the (7) line

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.