#7 train extenstion update - First phase completed w/ video


w8Hou

Recommended Posts

 

 

The first phase of the $2.1 billion project to extend the 7 train to the far West Side of Manhattan has been completed.

 

Mayor Michael Bloomberg and MTA Chairman Jay Walder announced Monday morning that the second of two tunnel boring machines had reached the southern wall of the 34th Street station cavern after drilling 2,900 feet under Eleventh Avenue from 26th Street.

 

The tunnel — financed by the city and the MTA — is meant to bring subway service to the Hudson Yards project, which would create a new neighborhood over MTA rail yards.

 

“It’s been a half century since City government expanded its subway system, but that drought will soon be at an end,” Bloomberg said in a news release.

 

“The redevelopment of the Hudson Yards has been talked about for decades, but with the expansion of the number 7 line, its potential will finally be realized.”

 

The boring machines were launched last summer. According to the city, the first 300 feet of drilling was slowed by soft ground, causing the use of a technique called "ground freeze" which hardens the ground and allows the machines to pass. As the machines proceed, they add concrete rings that line the tunnel wall.

 

The new service will run from Times Square to 34th Street and Eleventh Avenue. Tunnels were dug down to 25th Street to allow for train storage.

 

One boring machine has already started its journey toward 42nd Street, the city said. That tunnel will run under Eighth Avenue subway, NJ Transit, Amtrak, the former New York Central Line tunnels, the Lincoln Tunnel and the Port Authority Bus Terminal ramps.

 

Tunneling is scheduled to be completed by Spring 2010 when work will begin on the stations and ventilation. Service is scheduled to open in December 2013.

 

Source: http://www.dnainfo.com/20091221/midtown-west-hells-kitchen/first-phase-of-7-train-subway-extension-west-side-completed#ixzz0aP8bgxP4

Link to comment
Share on other sites

For me, the most fascinating aspect of the extension project is that they're using the closed-up lower level of the 8th Avenue IND at 42nd street to route the (7) through from Times Square.

 

I do wonder if they'll make a track connection at that point so that the (7) will have a second track connection to move trains through, in addition to the connection at the BMT Astoria Line.

 

Also I think it's interesting that where the (7) is being extended to happens to be also where the north end of High Line park will be when phase 3 is completed.

Link to comment
Share on other sites

There will be no track connection; that section of track on the 8th Ave. line is completely isolated from the main line.

 

Thanks for the info. I knew the track down there had been disconnected for a while, but my understanding was the tunnel up to the rest of the 8th Avenue line still existed and could be relaid with track.

Link to comment
Share on other sites

(A)ll Right Chealsie piers ,One step closer

 

It's not even close to Chelsea Piers, The last stop of the 7 extention line is 34th Street. They should have a plan to built an additional station somewhere near 24th-25th Street. That would be close to Chelsea Piers.

Link to comment
Share on other sites

It's not even close to Chelsea Piers, The last stop of the 7 extention line is 34th Street. They should have a plan to built an additional station somewhere near 24th-25th Street. That would be close to Chelsea Piers.

 

They have "storage tracks" all the way down to 24th street. The area at the "storage tracks" at the end is wide enough to be rebuilt into a station at some point.

Link to comment
Share on other sites