LRG 217 Posted July 27, 2010 Share #1 Posted July 27, 2010 Tunneling the Second Ave. subway has been "plagued" by equipment breakdowns, a top MTA executive said Monday - once again slowing progress on the long-awaited East Side line. The giant tunnel boring machine is carving through Manhattan bedrock an average of only about 14 feet a day - less than half the rate expected in the first stage of tunneling, the executive said at a Metropolitan Transportation Authority committee meeting. "We have yet to achieve the productivity I was hoping [for]," said Michael Horodniceanu, president of the MTA Captital Construction Co. "We were plagued by a lot of technical problems." The 400-foot machine started heading south under Second Ave. near 96th St. in mid June. Since then, the driveshaft broke and had to be replaced and there have been problems with electronic components and hydraulics systems, he said. Horodniceanu said he believed the tunneling contractor has fixed the problems, which are not uncommon in the first month or so after activating a tunnel boring machine. The MTA has pushed back the completion date for the project several times, most recently to December 2016. And the Federal Transit Administration last month sent a letter to the authority say it would likely be delayed again - to February 2018. In the letter, FTA Administrator Peter Rogoff said the project was affected by high construction costs but also said key management positions were not filled for months and delays resulted from design changes. Link: http://www.nydailynews.com/ny_local/2010/07/27/2010-07-27_equipment_failure_delays_2nd_ave_subway_again.html/index.html Link to comment Share on other sites More sharing options...
iGeMiNix 22 Posted July 27, 2010 Share #2 Posted July 27, 2010 All I gotta say is pretty much, whatever, cause nobody was really thinking the 2nd Ave Subway would be on schedule anyways. Link to comment Share on other sites More sharing options...
East New York 4,103 Posted July 27, 2010 Share #3 Posted July 27, 2010 All I gotta say is pretty much, whatever, cause nobody was really thinking the 2nd Ave Subway would be on schedule anyways. Right! I know I wasn't. Link to comment Share on other sites More sharing options...
DJ MC 1,208 Posted July 27, 2010 Share #4 Posted July 27, 2010 Please, watch the Nazi Banksters Crimes Ripple Effect at http://jforjustice.co.uk/banksters Link to comment Share on other sites More sharing options...
EE Broadway Local 18 Posted July 27, 2010 Share #5 Posted July 27, 2010 Possibly February 2018 for just Phase I (East 63d to East 96th Streets)? With luck, I may see Phase I and Phase II........ This is why we shouldn't worry/plan for the . Just dream. Link to comment Share on other sites More sharing options...
2Line1291 24 Posted July 27, 2010 Share #6 Posted July 27, 2010 There was a time when phase 1 was supposed/projected to be completed in 2014 and even 20 years ago and beyond that. It's like this century, projects are more likely to be delayed, delayed.... and delayed. Link to comment Share on other sites More sharing options...
Grand Concourse 2,690 Posted July 28, 2010 Share #7 Posted July 28, 2010 Which shows how stupid it was to have just one machine digging the entire segment. I can only hope the ones that finished drilling the extension could be brought up to 2nd Av and get the drilling done quicker. Link to comment Share on other sites More sharing options...
R110B 5 Posted July 28, 2010 Share #8 Posted July 28, 2010 Wirelessly posted via (Mozilla/5.0 (Danger hiptop 4.6; U; rv:1.7.12) Gecko/20050920) They should have orderd 4 tbms then it would have been done sooner and Quicker than just waiting with 1 to do all that work. what a dumb idea to do so not smart at all at this rate the sas may be never be finished. Link to comment Share on other sites More sharing options...
w8Hou 64 Posted July 28, 2010 Share #9 Posted July 28, 2010 At this rate, they probably be on the record books. They can not get the completion date right on this long lasting construction. Link to comment Share on other sites More sharing options...
LRG 217 Posted July 28, 2010 Author Share #10 Posted July 28, 2010 Wirelessly posted via (Mozilla/5.0 (Danger hiptop 4.6; U; rv:1.7.12) Gecko/20050920) They should have orderd 4 tbms then it would have been done sooner and Quicker than just waiting with 1 to do all that work. what a dumb idea to do so not smart at all at this rate the sas may be never be finished. With what money??? Link to comment Share on other sites More sharing options...
R110B 5 Posted July 28, 2010 Share #11 Posted July 28, 2010 Wirelessly posted via (Mozilla/5.0 (Danger hiptop 4.6; U; rv:1.7.12) Gecko/20050920) The money that came from the FTA. Or if they want to be cheap about it use the tbms from the 7 extension project and just change the cutter head on them. Link to comment Share on other sites More sharing options...
NYtransit 457 Posted July 28, 2010 Share #12 Posted July 28, 2010 what else is new? Link to comment Share on other sites More sharing options...
INDman 414 Posted July 28, 2010 Share #13 Posted July 28, 2010 what else is new? New York, New Jersey, and a little bit of New Mexico. Link to comment Share on other sites More sharing options...
PATCOman 196 Posted July 28, 2010 Share #14 Posted July 28, 2010 The Cubs might win a World Series before the Second Avenue Subway is completed! Link to comment Share on other sites More sharing options...
Joe C 97 Posted July 28, 2010 Share #15 Posted July 28, 2010 I can only hope the ones that finished drilling the extension could be brought up to 2nd Av and get the drilling done quicker. Right,like that'll make a diffrence. Link to comment Share on other sites More sharing options...
Princelex 281 Posted July 28, 2010 Share #16 Posted July 28, 2010 My eyes roll at this news. Pure bullshit, but this is just another day with the . Link to comment Share on other sites More sharing options...
Grand Concourse 2,690 Posted July 29, 2010 Share #17 Posted July 29, 2010 Right,like that'll make a diffrence. Better 2 drills running than expecting the same drill to dig thru two separate tunnels. Link to comment Share on other sites More sharing options...
553 Bridgeton 548 Posted July 29, 2010 Share #18 Posted July 29, 2010 What else is new? Link to comment Share on other sites More sharing options...
Roadcruiser1 286 Posted July 29, 2010 Share #19 Posted July 29, 2010 Nothing much. Just I might not live to see a run up to the fourth phase. I might live for the third phase but the fourth phase might still be under construction when I die. Which would be somewhere in the late 2070's. One thing though I assure you in the future most of the grandchildren or children of us rail fans would finally post a blog that says. Second Avenue is Complete After 70 years!!!. Link to comment Share on other sites More sharing options...
TOURQuarterback12 0 Posted July 30, 2010 Share #20 Posted July 30, 2010 Don't forget about the technological side of the project. Its posted that the 2nd Ave Subway should be done completely by 2065 as of right now. Can anybody fill me in the on the 4 phases and the things in each stage? Thanks. That I dont know about. Link to comment Share on other sites More sharing options...
Grand Concourse 2,690 Posted July 30, 2010 Share #21 Posted July 30, 2010 From memory: Phase 1 - to 96th Phase 2 - north to 125th Phase 3 - south from 72nd to Houston Phase 4 - south to Hanover Sq via Water st. Link to comment Share on other sites More sharing options...
Roadcruiser1 286 Posted July 30, 2010 Share #22 Posted July 30, 2010 If it does happen in our life time then this might happen: Link to comment Share on other sites More sharing options...
553 Bridgeton 548 Posted July 30, 2010 Share #23 Posted July 30, 2010 If it does happen in our life time then this might happen: When fish ride bikes.... All them stupid little spur lines will never happen and I REPEAT will never happen. Link to comment Share on other sites More sharing options...
Grand Concourse 2,690 Posted July 30, 2010 Share #24 Posted July 30, 2010 As much as I like the ideas, let's be realistic: one we'll be lucky anything gets built south of 72nd St and two, we'll be lucky if they get as far a Houston to be able to pick from ONLY ONE of those lines to LM. Link to comment Share on other sites More sharing options...
Roadcruiser1 286 Posted July 30, 2010 Share #25 Posted July 30, 2010 They are actually not spurs they are ways for the Second Avenue Subway to access Brooklyn. The tunnels or bridges are going to be used to connect to Brooklyn via cheaper ways so the won't spend too much. I still favor the to run to Brooklyn via the Manhattan Bridge. Though I was thinking about the Avenue C spur and I am wondering why would you extend the Second Avenue Subway to the Eighth Avenue Line when you could extend the Eighth Avenue Line east and the Second Avenue Subway east so they could construct the never built IND Worth Street Line to the never built IND Utica Line. Link to comment Share on other sites More sharing options...