NX Express Posted November 2, 2010 Share #1 Posted November 2, 2010 Due to an ongoing rail condition at the 59th Street-Lexington Avenue Station: There is no service on the and trains between the Queensboro Plaza Station and the 57th Street-7th Avenue Station. train service will run on the line from the 57th Street-7th Avenue Station to the 36th Street Station in both directions. Customers are advised to use the train for service to and from Queens. Please expect delays in , and train service. Wonder what's up? It's been going on for quite a while now.:eek: Link to comment Share on other sites More sharing options...
Broadway Local Posted November 2, 2010 Share #2 Posted November 2, 2010 I think there is a broken rail. Link to comment Share on other sites More sharing options...
Roadcruiser1 Posted November 2, 2010 Share #3 Posted November 2, 2010 No wonder why I saw an train at Grand Street today or is it some whole other reason. Link to comment Share on other sites More sharing options...
R44 CNG Posted November 2, 2010 Share #4 Posted November 2, 2010 Nice via that connection to the :cool: Link to comment Share on other sites More sharing options...
Roadcruiser1 Posted November 2, 2010 Share #5 Posted November 2, 2010 Well now that you mentioned it. It was cool seeing an using the Sixth Avenue Line along with the Manhattan Bridge tracks at Grand Street. Link to comment Share on other sites More sharing options...
Abba Posted November 2, 2010 Share #6 Posted November 2, 2010 Wow a 6 hour broken rail.Service has to be suspended so long for that. They can't at least restore some service and have a slow speed order? Was it a minor derailment or something? Link to comment Share on other sites More sharing options...
CenSin Posted November 2, 2010 Share #7 Posted November 2, 2010 I was at Canal Street (southbound) at around 6:15pm. The took forever to arrive, and when I got on it with my friends it was already crowded The train proceeded at slower-than-normal speeds to 59 Street and then stalled at 86 Street for about 10 to 20 minutes because the terminal was full… In addition, I don't think trains were running. The announcements suggested Brighton passengers take the to Atlantic Avenue–Pacific Street for a transfer to the (. Link to comment Share on other sites More sharing options...
Fresh Pond Posted November 2, 2010 Share #8 Posted November 2, 2010 I was caught in it comming from work around 10. It was a broken rail in the Queens-bound 60 St tunnel. It was a total disaster. All NB trains had to check into the tower at Herald Sq which delayed everything even more. This is how they had things going... all trains to Lex-59 St and a special shuttle train from Queensboro Plz to Ditmars Blvd. The trains to Lex-59 St terminated on the Queens-bound track so they wouldn't delay downtown trains (which was still running normal). all trains to 57 St-7 Av. They all terminated on the downtown express track so they won't back up the trains. express Times Sq to 57 St-7 Av then via from 57 St-7 Av to 36 St, but there were a few going up 6 Av completely. I went down to the platform at Herald Sq and a pulled up. And to add insult to injury, there was also a police investigation at 86 St on the so the trains at that time went to 59 St and there was a special shuttle from 59 St to 86 St Link to comment Share on other sites More sharing options...
INDman Posted November 2, 2010 Share #9 Posted November 2, 2010 There was a fatal 12-9 at 45th street on the , the railroad went to shit this evening. Link to comment Share on other sites More sharing options...
Fresh Pond Posted November 2, 2010 Share #10 Posted November 2, 2010 There was a fatal 12-9 at 45th street on the , the railroad went to shit this evening. So that's what that was...oh well add another one to the list Link to comment Share on other sites More sharing options...
T to Dyre Avenue Posted November 2, 2010 Share #11 Posted November 2, 2010 I got caught up in that delay too. I got to Canal Street (northbound) at 4:30. No trains came for 15 minutes. Finally, a came. That crawled up the express tracks the whole way then stopped for about 10 minutes at 28th Street. The only explanation given was "a signal problem" at Lex and trains were just "running at slower speeds." I see that it only got much worse later on. Link to comment Share on other sites More sharing options...
CenSin Posted November 2, 2010 Share #12 Posted November 2, 2010 I was caught in it comming from work around 10. It was a broken rail in the Queens-bound 60 St tunnel. It was a total disaster. All NB trains had to check into the tower at Herald Sq which delayed everything even more. This is how they had things going... all trains to Lex-59 St and a special shuttle train from Queensboro Plz to Ditmars Blvd. The trains to Lex-59 St terminated on the Queens-bound track so they wouldn't delay downtown trains (which was still running normal). all trains to 57 St-7 Av. They all terminated on the downtown express track so they won't back up the trains. express Times Sq to 57 St-7 Av then via from 57 St-7 Av to 36 St, but there were a few going up 6 Av completely. I went down to the platform at Herald Sq and a pulled up. And to add insult to injury, there was also a police investigation at 86 St on the so the trains at that time went to 59 St and there was a special shuttle from 59 St to 86 St Like this? Link to comment Share on other sites More sharing options...
Fresh Pond Posted November 3, 2010 Share #13 Posted November 3, 2010 Like this? In a nutshell, yes Link to comment Share on other sites More sharing options...
NYCTSignals Posted November 4, 2010 Share #14 Posted November 4, 2010 las nite there were 4 broken rails.....1 at 5th ave nd lex..........2 in the tube north bound and 1 in the tube south bound ! Freakin crazy....and the broken rail from this thread was sb in the 60th st tube as well Link to comment Share on other sites More sharing options...
ColumbiaDeath Posted November 4, 2010 Share #15 Posted November 4, 2010 Now there's a rail condition at Hoyt-Schermerhorn and also W. 4th! Link to comment Share on other sites More sharing options...
INDman Posted November 4, 2010 Share #16 Posted November 4, 2010 las nite there were 4 broken rails.....1 at 5th ave nd lex..........2 in the tube north bound and 1 in the tube south bound ! Freakin crazy....and the broken rail from this thread was sb in the 60th st tube as well The two broken rail in the 60th St tube were described to me as "catastrophic" defects and they were discovered around 04:45-05:00 by track inspectors. I think the TA will have a serious bone to pick with the people at Sperry. Link to comment Share on other sites More sharing options...
R32 3348 Posted November 4, 2010 Share #17 Posted November 4, 2010 I got caught in this mess on Monday too. At Lex-59th the platform was just packed completely. The stairways were practically at a standstill. By the time everyone coming down the stairs realized that there were no trains going to Queens they went back up and the became a mess too. 51st St. and Grand Central on the were packed beyond belief too. I got on the 3rd train home, but I realized I could've just left 59th St. for the ... Link to comment Share on other sites More sharing options...