Program Update effective 2/20/19

E70AE3B5-BCC7-4242-8958-215EA3B3E968.jpeg

2A3D4B44-9846-4D37-8FFE-88142B572B51.jpeg

844D9F11-6BFF-4B1B-A0AA-CEEF1E3D444B.jpeg

D143F871-E911-4F90-BF83-14B590D436A2.jpeg

018FCF27-0E25-47C4-8133-9E14E0160D65.jpeg

FCAB8EC7-FC4C-45EB-95CC-8F213A2E4F1E.jpeg

Message added by East New York

Recommended Posts

Anyone know if these cars have an integrated IP network for like Train Motion Commands?  Could this be a reason for the longer testing period?

Share this post


Link to post
Share on other sites

On 11/5/2017 at 7:52 PM, Union Tpke said:

Once most, if not all, lines have CBTC, how will Museum trains run?

That's a good question. But since it was answered already then I won't say anything. 

 

12 hours ago, RailRunRob said:

Anyone know if these cars have an integrated IP network for like Train Motion Commands?  Could this be a reason for the longer testing period?

Probably, I'm just hoping for them to enter service on the (J) train since I rely on it to go to school everyday 

Share this post


Link to post
Share on other sites
On 11/5/2017 at 8:19 PM, P3F said:

Aren't they installing a new fixed block signal system in conjunction with CBTC on the Flushing line? I had heard they were doing this to avoid the fiascoes the (L) has where the line has to essentially not run whenever something goes wrong with CBTC.

I still want to know who' dumb idea it was to remove most of the signals along the (L) , did this person not think of a failsafe when CBTC fails on one of the most used lines in the system?

Share this post


Link to post
Share on other sites

Well it turns out bart is also having problems with their new trains and australia is also 2 years  behind

Edited by BreeddekalbL

Share this post


Link to post
Share on other sites
2 hours ago, subwaycommuter1983 said:

I just answered my own question. 

 

No interior equipment?

Is it almost ready?

Edited by CTK246

Share this post


Link to post
Share on other sites

Ok, we have our first in service date!

Should things go to plan, the R179's will start their 30 day passenger test this upcoming Saturday, the 18th of November, on the (J) line.

  • Like 1
  • Thanks 1

Share this post


Link to post
Share on other sites
23 minutes ago, R42N said:

Ok, we have our first in service date!

Should things go to plan, the R179's will start their 30 day passenger test this upcoming Saturday, the 18th of November, on the (J) line.

Was this confirmed anywhere?

 

Forgive me if I sound skeptical, but the way this order has gone, I feel like they'd wait at least a little longer testing until they put it in service. Unless, of course, it's passed the 30-day burn in testing.

  • Upvote 1

Share this post


Link to post
Share on other sites

well, I just hope that the R179's enter service on the (A)(C)(J) and (Z) lines. And since 300 R179's are expected, then 

50 R42's gone

222 Revenue R32's are still in and about 110-112 R32's will remain so

the (speculated) fleet assignments would be

(A) 40 cars (4 trains) Replaces 40 R32 cars

(C) 160 cars (20 trains) All R32's replaced on that route

(J)(Z) 120 cars (15 trains): replaces all R42's and some R32's

Share this post


Link to post
Share on other sites
1 hour ago, R42N said:

Ok, we have our first in service date!

Should things go to plan, the R179's will start their 30 day passenger test this upcoming Saturday, the 18th of November, on the (J) line.

Awesome!! I'm assuming that it's the two 8 car sets that will do the passenger test on the J.

Share this post


Link to post
Share on other sites
1 hour ago, R42N said:

Ok, we have our first in service date!

Should things go to plan, the R179's will start their 30 day passenger test this upcoming Saturday, the 18th of November, on the (J) line.

What's your source on this?

  • Upvote 6

Share this post


Link to post
Share on other sites
2 hours ago, R42N said:

Ok, we have our first in service date!

Should things go to plan, the R179's will start their 30 day passenger test this upcoming Saturday, the 18th of November, on the (J) line.

Unless there's a confirmed source, I'm not buying it.

  • Upvote 9

Share this post


Link to post
Share on other sites
2 hours ago, LGA Link N train said:

well, I just hope that the R179's enter service on the (A)(C)(J) and (Z) lines. And since 300 R179's are expected, then 

50 R42's gone

222 Revenue R32's are still in and about 110-112 R32's will remain so

the (speculated) fleet assignments would be

(A)40 cars (4 trains) Replaces 40 R32 cars

(C) 160 cars (20 trains) All R32's replaced on that route

(J)(Z) 120 cars (15 trains): replaces all R42's and some R32's

This don't add up... 40+160+120 = don't  equal 300  R179s on order...

you math is 20 cars more than what was ordered...

  • LMAO! 1

Share this post


Link to post
Share on other sites
8 minutes ago, B22viaAtlanticAv said:

This don't add up... 40+160+120 = don't  equal 300  R179s on order...

you math is 20 cars more than what was ordered...

let's revise by taking 20 cars out. then there wouldbe

(A) 40 cars (4 trains)

(C) 136 cars (17 trains)

(J)(Z) 120 cars (15 trains)

Then there would be an extra 4 car set, is that better for ya

Share this post


Link to post
Share on other sites
1 hour ago, Cait Sith said:

Unless there's a confirmed source, I'm not buying it.

I take no offense, and you have every right to be skeptical. The current schedule is for a Saturday commencement of the 30-day test. That's obviously subject to change, but that's that. 

 

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.