East New York

R179 Discussion Thread

East New York

Program Update effective 2/20/19

E70AE3B5-BCC7-4242-8958-215EA3B3E968.jpeg

2A3D4B44-9846-4D37-8FFE-88142B572B51.jpeg

844D9F11-6BFF-4B1B-A0AA-CEEF1E3D444B.jpeg

D143F871-E911-4F90-BF83-14B590D436A2.jpeg

018FCF27-0E25-47C4-8133-9E14E0160D65.jpeg

FCAB8EC7-FC4C-45EB-95CC-8F213A2E4F1E.jpeg

Message added by East New York

Recommended Posts

The Second Avenue "Subway", whenever it opens, will be a grand total of four extra stops.

 

You will Still need Extra trains plus Your going to have to increase the headways on the (Q) and your going to need more trains for that

Share this post


Link to post
Share on other sites

You will Still need Extra trains plus Your going to have to increase the headways on the (Q) and your going to need more trains for that

 

But then they'd need to be decreased again when the (T) finally exists.

(Even though I question why the (Q)'s headways would need to be significantly increased for it to run an extra 5-7 stops from Midtown)

Share this post


Link to post
Share on other sites
You will Still need Extra trains plus Your going to have to increase the headways on the (Q) and your going to need more trains for that

 

But it's not going to be a plethora of trains that's needed. At worst, the R211s will be a bigger order than first intended.

 

But then they'd need to be decreased again when the (T) finally exists.

(Even though I question why the (Q)'s headways would need to be significantly increased for it to run an extra 5-7 stops from Midtown)

 

Its more "if" than "when" at this point.

Share this post


Link to post
Share on other sites
Just put it this way The TA needs to do another SMS this time replace the A/C's on the R32's, The R46's WILL NOT GO TO SI, They already tried doing that (unless something changes) because SI wants New RailCars.

 

Here's my input on this:

 

Why Order Now 2nd ave subway will be opening in 2018 will just make the R179's a Big ass order so this way they won't be short of equipment, The R32's won't go nowhere until there is enough cars to replace them the R46's are staying here for awhile they are too good in shape to be replaced, the R211 would replace most or all of them, You guys have to remember the MTA is is a Bad situation right now The money needs to go to the stations and not towards new subway cars.

 

They need to do a small rehab to the R32's so this way they can make it until the new car order is here, and from a TA source they are staying put until 2014-15 so They have to stay and the R32's still look good for their age and Now I see 207th doing the best they can to keep them in running shape.

 

That is incorrect sir. The R46 WILL be going to SI. I have the documents right here in front of me. And as I have said a million times, funds for equipment, and funds for operating come from two separate budgets.

 

This is the current projected timeline.

April - Award base contract for 290 R179's

June - Award option to Kawasaki for 123 additional R188's

January 2012 - Award option for 50 additional R179's, and award contract for SIR R46 retrofit program.

Share this post


Link to post
Share on other sites
That is incorrect sir. The R46 WILL be going to SI. I have the documents right here in front of me. And as I have said a million times, funds for equipment, and funds for operating come from two separate budgets.

 

This is the current projected timeline.

April - Award base contract for 290 R179's

June - Award option to Kawasaki for 123 additional R188's

January 2012 - Award option for 50 additional R179's, and award contract for SIR R46 retrofit program.

 

I'm guessing the R46s will most likely see service on the (A), (C), and SIR after the R179 delivery, is that correct?

Share this post


Link to post
Share on other sites
I'm guessing the R46s will most likely see service on the (A), (C), and SIR after the R179 delivery, is that correct?

 

I'm not sure about that one.

Share this post


Link to post
Share on other sites
That is incorrect sir. The R46 WILL be going to SI. I have the documents right here in front of me. And as I have said a million times, funds for equipment, and funds for operating come from two separate budgets.

 

This is the current projected timeline.

April - Award base contract for 290 R179's

June - Award option to Kawasaki for 123 additional R188's

January 2012 - Award option for 50 additional R179's, and award contract for SIR R46 retrofit program.

 

I will just wait and see at this moment because I spoke to a TA soruce and he told me different but Seeing R46's in SI wouldn't be a problem and the SI Politics will have a bicth fit, but it would make sense to send the 46's out there.

Share this post


Link to post
Share on other sites
I will just wait and see at this moment because I spoke to a TA soruce and he told me different but Seeing R46's in SI wouldn't be a problem and the SI Politics will have a bicth fit, but it would make sense to send the 46's out there.

 

Thats cool if you want to wait and see. Nothing wrong with that. I'm just saying that its been confirmed, I have the documents on it, and it's posted on the MTA website now somewhere.

Share this post


Link to post
Share on other sites
Thats cool if you want to wait and see. Nothing wrong with that. I'm just saying that its been confirmed, I have the documents on it, and it's posted on the MTA website now somewhere.

 

Yeah I will search for it whenever I get the chance but they are wasting alot of money just to retrofit R46's.

Share this post


Link to post
Share on other sites
Yeah I will search for it whenever I get the chance but they are wasting alot of money just to retrofit R46's.

 

No, they are actually saving hundreds of millions by holding off on replacing the SIR equipment with brand new cars.

Share this post


Link to post
Share on other sites

How much retrofitting has to be done on the R46s? The only thing I can see is giving the units couplers on both ends of the cars so they can be single units. Is there anything else I'm missing?

Share this post


Link to post
Share on other sites
How much retrofitting has to be done on the R46s? The only thing I can see is giving the units couplers on both ends of the cars so they can be single units. Is there anything else I'm missing?

 

Yeah, they have to get cab signalling added and some other FRA stuff.

Share this post


Link to post
Share on other sites
iirc, the 123 options on the R188 were excersized months ago, so that part of the document would be a little outdated...

 

From what I was told when I originally posted about it late last year, only the base contact has been awarded.

Share this post


Link to post
Share on other sites

Well if the R160 looks alot like the R143, then I bet the R179 will look alot like the R160. I wish in the FINDs they would put what time the train would get to a certian station (under the station name, put "time arrives: 12:00am", example).

 

what im wondering most is what the propulsion will sound like the most :o.

Share this post


Link to post
Share on other sites

Wirelessly posted via (BlackBerry8520/5.0.0.900 Profile/MIDP-2.1 Configuration/CLDC-1.1 VendorID/100)

 

The R32s may look "good" on the outside but they're slowly dying on the inside. 46 years is long enough

Share this post


Link to post
Share on other sites
Wirelessly posted via (BlackBerry8520/5.0.0.900 Profile/MIDP-2.1 Configuration/CLDC-1.1 VendorID/100)

 

The R32s may look "good" on the outside but they're slowly dying on the inside. 46 years is long enough

 

When A new Car Order Come (If it Comes) The R32's will Retire (2014/15), They can't go anywhere, In Other Countries you have trains that are old as the R1/9's still running, All a Train Needs is Good mantanice and its good to go.

Share this post


Link to post
Share on other sites

Sorry R42 M Train. They only put on the Siemens propulsion on those R143's for testing so they can see if it would work on the R160B's. Once it was over they put the original Adtranz propulsion back on those R143's.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.