Jump to content
Attention: In order to reply to messages, create topics, have access to other features of the community you must sign up for an account.
Sign in to follow this  
metsfan

PATH problems!

Recommended Posts

"6/10/2008 9:48:42 PM

Due to a signal problem, train service on the Newark to World Trade Center line is operating with a 20 minute delay. "

 

- Andy

Share this post


Link to post
Share on other sites
"6/10/2008 9:48:42 PM

Due to a signal problem, train service on the Newark to World Trade Center line is operating with a 20 minute delay. "

 

- Andy

 

 

Damn its still having problems

Share this post


Link to post
Share on other sites
Damn its still having problems

 

Lightning struck the track area & fried a signal. 2 trains were back to back by harrison because of it, the one in the back slammed on its brakes automatically when the signal system went down.

 

- Andy

Share this post


Link to post
Share on other sites
Lightning struck the track area & fried a signal. 2 trains were back to back by harrison because of it, the one in the back slammed on its brakes automatically when the signal system went down.

 

- Andy

 

Ouch B) damn I feel bad for ppl whom took that train 2day

Share this post


Link to post
Share on other sites
Ouch B) damn I feel bad for ppl whom took that train 2day

 

My girlfriend was on the train that slammed on the brakes. She got tossed out of her seat. She heard extremely loud thunder, but didn't see the lightning, the thunder was associated with the brake application.

 

- Andy

Share this post


Link to post
Share on other sites
My girlfriend was on the train that slammed on the brakes. She got tossed out of her seat. She heard extremely loud thunder, but didn't see the lightning, the thunder was associated with the brake application.

 

- Andy

 

Is she feeling alright? Wow that is some scary stuff right there.

Share this post


Link to post
Share on other sites
Is she feeling alright? Wow that is some scary stuff right there.

 

Yea, she's fine, aside from having her trip from newark to jsq take an hour after the jolt with constant stops & starts....

 

- Andy

Share this post


Link to post
Share on other sites

Damn, PATH was really having a bad day. Had to work on two lines before the next morning. They did fix what was needed on the red line pretty fast but yellow and blue lines were still down.

Share this post


Link to post
Share on other sites
Damn, PATH was really having a bad day. Had to work on two lines before the next morning. They did fix what was needed on the red line pretty fast but yellow and blue lines were still down.

 

That explains the stopped train in front.

 

- Andy

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.