Part Suspended

(B) , (D) , (N) , (Q)  and (R) service is significantly disrupted between Brooklyn and Manhattan because of a switch problem at DeKalb Av.  

(B) TRAINS

Northbound (B) train departures from Brighton Beach have been suspended.

There is no southbound (B) service past Broadway-Lafayette St in Manhattan. All southbound (B) trains will run on the (F) line from Broadway-Lafayette St to 2 Av and turn back northbound. 

(D) TRAINS

There is extremely limited northbound (D) service between Brooklyn and Manhattan. Most northbound (D) trains will end at Atlantic Av - Barclays Ctr and turn back toward Coney Island. 

There is no southbound service on the (D) line from W 4 St - Wash Sq to Coney Island - Stillwell Av. Southbound (D) trains are running on the (F) line between those stations. 

(N) /(Q) TRAINS

Northbound (Q) trains are running with extensive delays in Brooklyn. 

Northbound (N) and (Q) trains are running on the Rline from DeKalb Av to Canal St. 

At Canal St, board northbound (N)/(Q)  trains on the (R) train platform.

Posted: 7/13/20 9:21 AM

Link to comment
Share on other sites


  • Replies 8.1k
  • Created
  • Last Reply

Part Suspended  Posted: 7/16/20 9:14 PM

Northbound (2) trains are running on the (4) / (5) line from Nevins St to 149 St - Grand Concourse while our crews investigate the tracks between Clark St and Wall St.
(3) trains are running in two sections:
-Between New Lots Av and Atlantic Av - Barclays Ctr
-Between Harlem - 148 St and Whitehall St - South Ferry
Expect extensive delays in (2)(3) and (4) service.

 

Link to comment
Share on other sites

MULTIPLE IMPACTS  Posted: 07/17/2020  1:59PM

While we work to correct a switch problem at Queensboro Plaza, the following service changes are in effect:

There is no (N) or (W) service between Lexington Av/59 St and Queensboro Plaza.
Northbound (N) trains are ending at 57 St - 7 Av or Lexington Av/59 St.
Northbound (W) trains are running on the (Q) line from 57 St - 7 Av to96 St.

Northbound (R) trains are running on the (Q) line from 57 St - 7 Av to Lexington Av/63 St then on the (F) line to 36 St.

For service between Manhattan and Queens, consider taking a (7)(E)(F) and (M) train or the Q69, Q100, Q101, and Q102 buses.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

This is an interesting one:

 

PART SUSPENDED  Posted: 7/17/20 2:27 PM

There is no (2) train service between Nereid Av/Gun Hill Rd and Wakefield - 241 St while our crews work to correct a switch problem at Wakefield - 241 St.

The last stop on northbound (2) trains will be Nereid Av.

The first stop on southbound (2) trains will be Gun Hill Rd.

For alternate service, take a Bx39 bus.

 

 

Edited by BM5 via Woodhaven
Link to comment
Share on other sites

TRAINS REROUTED  Posted: 07/19/2020  2:02PM

(D) , (F) and (Q) trains are detoured in both directions while our crews work to correct a switch problem at 47-50 Sts - Rockefeller Ctr.

Southbound (D) trains are running on the (A) line from 59 St - Columbus Circle to Canal St and then on the (E) line to World Trade Center, the last stop.

Southbound (F) trains are running on the (E) line from Jackson Hts - Roosevelt Av to W 4 St - Wash Sq.

Northbound (Q) trains will run on the (R) line starting at DeKalb Av and end at either Whitehall St - South Ferry or 34 St - Herald Sq.

Expect delays on (D) , (F) and (Q) trains in both directions.

 

Not Mentioned:

  • Some SB (D) trains are operating on the (A) from 59th Street to West 4th Street or Jay Street-MetroTech, then over the (F) to Church Avenue and terminate
  • Some SB (F) trains are operating on the (E) from Roosevelt Avenue to Queens Plaza, then via the (G) to Church Avenue
  • NB (F) trains are running on the (C) between Jay Street-MetroTech and 42nd Street-PABT, then over the (E) to Roosevelt Avenue
  • NB (D) trains are terminating at 36th Street or Whitehall Street (confirmation?)
  • Some NB (F) trains are terminating in Manhattan
Link to comment
Share on other sites

Update to what's above:

MULTIPLE IMPACTS  Posted: 07/19/2020  3:08PM

While our crews work to correct a switch problem at 47-50 Sts - Rockefeller Ctr the following service changes are in effect:
Southbound (D) trains are running on the (A) line from 59 St - Columbus Circle to Canal St and then on the (E) line to World Trade Center, the last stop.
Southbound (F) trains are running on the (E) line from Jackson Hts - Roosevelt Av to W 4 St - Wash Sq.
Northbound (D) and (F) trains are ending at 34 St - Herald Sq.
Northbound (Q) trains will run on the (R) line starting at DeKalb Av and end at either Whitehall St - South Ferry or 34 St - Herald Sq.
Southbound (Q) trains are ending at Times Sq - 42 St.
Expect extensive delays in (D)(F) and (Q) trains. 

 

Not Mentioned:

  • Some NB (D) trains are running on the (N) express from DeKalb Avenue, final destinations unknown
  • Some SB (D) trains are running on the (C) from 59th Street to Jay Street-MetroTech then over the (F) to Church Avenue
  • Some SB (Q) trains are running via the Broadway Line from Lexington Ave-63 St to DeKalb Avenue, then via the (D) to Coney Island

On SubwayTime, there are also " (E) 42 St-Bus Term" readings at World Trade Center. Those might be (D) trains. Also, the SB (Q) trains to Coney Island via West End show up as " (F) Stillwell Ave" on the Broadway, 4th Avenue, and West End Lines.

-------------------------------------------------------------------------------------------------------------------------------------------------

Well, service is resuming, although with all the trains out of place, it'll take quite some time before service shows some semblance of regular service:

SLOW SPEEDS  Posted: 07/19/2020  3:48PM

(D)(F) and (Q) trains have resumed their regular routes with extensive delays in both directions while our crews continue working to correct a switch problem at 47-50 Sts - Rockefeller Ctr
During this time downtown trains are running at slower speeds in that area.

 

Thinking about this, if a (Q) train was in the right place and there was a lot of congestion on 6th Avenue, there may have been a possibility where one train (or two), may have ended up on the 8th Avenue Line into upper Manhattan to avoid the mess north of West 4th Street when the switch problem first started. 

Edited by BM5 via Woodhaven
Link to comment
Share on other sites

51 minutes ago, Lawrence St said:

Why wasn't the (Q) just rerouted via Mountague all the way to 96th St?

They’re doing work along the (Q) Line, my guess is that the work is happening between Lex-63rd and 57th Street, which is why they can’t sent (Q) trains up there anyway.
 

If that weren’t the case, then there wouldn’t have been a reason to send the (Q) to 6th Avenue in the first place...

Link to comment
Share on other sites

2 hours ago, LegoBrickBreaker101 said:

They’re doing work along the (Q) Line, my guess is that the work is happening between Lex-63rd and 57th Street, which is why they can’t sent (Q) trains up there anyway.
 

If that weren’t the case, then there wouldn’t have been a reason to send the (Q) to 6th Avenue in the first place...

Well thats incorrect, because it says "southbound (Q) trains are terminating at 42nd St".

So the work is most likely at DeKalb Av, and to not clog up the (R) they just run it via the (B) to 47th St.

Link to comment
Share on other sites

1 hour ago, Lawrence St said:

Well thats incorrect, because it says "southbound (Q) trains are terminating at 42nd St".

So the work is most likely at DeKalb Av, and to not clog up the (R) they just run it via the (B) to 47th St.

If that was true, (Q) trains would have just operated via the Montague Tunnel in both directions, and they would have not had trains go on 6th Avenue. There's been multiple weekends late last year where both (N) and (Q) trains were running via the Montague Tunnel with the (R). It is very likely that work was being done in that area, and they've halted work. I don't remember which GO it was, but something occurred that required trains to use trains to go through an area where there was work being done. If I'm not mistaken, it was that very section (57th/7th to Lexington Avenue-63rd Street) that was used. 

Link to comment
Share on other sites

Oy

TRAINS REROUTED  Posted: 07/25/2020  5:55PM

The last stop on some (A) , (C) and (F) trains will be 2 Av while we investigate why a train's brakes were activated at Delancey St - Essex St.

Expect delays as we get trains back on schedule.

 

TRAINS REROUTED  Posted: 07/25/2020  6:01PM

Manhattan-bound (R) trains are running over the (F) line from 36 St to Lexington Av/63 St while we address a signal problem in the tunnel between Manhattan and Queens.

 

Not Mentioned:

  • Some (R) trains are running on the (D) from DeKalb Avenue to West 4th Street, then via the (M) to Queens Plaza
     
Edited by BM5 via Woodhaven
Link to comment
Share on other sites

PART SUSPENDED  Posted: 07/27/2020  6:03PM

While we investigate why a train's brakes were activated between Lexington Av/59 St and Queens Plaza the following service changes are in effect:

There is no (N) and (W) service between Queensboro Plaza and 57 St - 7 Av in both directions.

Southbound (R) trains are stopping along the (F) line from 36 St (Qns) to Lexington Av/63 St then via the (Q) line to 57 St - 7 Av.

For service to Astoria, use (7) train service to Queensboro Plaza.

Link to comment
Share on other sites

PART SUSPENDED  Posted: 07/30/2020  7:49PM

(6) train departures are temporarily suspended from Brooklyn Bridge - City Hall while we while we troubleshoot a malfunctioning signal in the Brooklyn Bridge Loop.

Downtown (6) trains will run to Bowling Green, where they’ll turn around for uptown service.

 

Link to comment
Share on other sites

Today might be a busy day. Earlier there was also a (3) train suspension between Utica Ave and New Lots Ave. 

 

PART SUSPENDED  Posted: 08/04/2020 12:11PM

(L) service is suspended in both directions between Broadway Jct and Canarsie - Rockaway Pkwy while our crews respond to a large fallen tree on the tracks at E 105 St.

The last stop on some Canarsie-bound (L) trains will be Myrtle - Wyckoff Avs.

 

LOCAL TO EXPRESS  Posted: 08/04/2020 12:16PM

Manhattan-bound (J) and (M) trains are running express from Myrtle Av to Marcy Av while we remove debris from the tracks at Myrtle Av.

 

EXPRESS TO LOCAL  Posted: 08/04/2020 11:51AM

Southbound (N) and (Q) trains are running local from 34 St - Herald Sq to Canal St while we inspect the tracks at 34 St - Herald Sq.

Edited by BM5 via Woodhaven
Link to comment
Share on other sites

The Q114 doesn't serve Howard Beach...

 

PART SUSPENDED  Posted: 08/04/2020  1:14PM

(3) train service is suspended between Crown Hts - Utica Av and New Lots Av in both directions while we work to remove tree branches from the tracks along the line.

 

PART SUSPENDED  Posted: 08/04/2020  1:06PM

There is no (A) train service between Howard Beach - JFK Airport and Far Rockaway - Mott Av/Rockaway Park - Beach 116 St while we work to remove debris from the tracks near Broad Channel.
For service between Howard Beach - JFK Airport and Far Rockaway - Mott Av, take the Q114 Bus.
For service between Howard Beach - JFK Airport and Rockaway Park - Beach 116 St, take the Q53-SBS bus.
Please see a station agent for a courtesy pass.

 

PART SUSPENDED  Posted: 08/04/2020  1:12PM

(Q) trains are re-routed in both directions in Brooklyn while we remove debris from the tracks near Avenue M and Newkirk Plaza

(B) train service is suspended in Brooklyn.

There is no (Q) service between DeKalb Av and Kings Hwy.

All (Q) trains are running on the (N) line in both directions between DeKalb Av and Coney Island - Stillwell Av.

There is limited (Q) shuttle service between Coney Island - Stillwell Av and Kings Hwy.

All downtown (B) trains are ending at 2 Av on the (F) line, where they will turn around for uptown service.

For service between Kings Hwy and DeKalb Av, take nearby B6, B8, B9, B12, B11, B35, B41 and B82 buses to nearby (F) , (N) , (R) or (2) trains. 

Please see a station agent to receive a courtesy pass for continuing service.

 

SUSPENDED  Posted: 08/04/2020  1:00PM

sf.png service is suspended in both directions while we work to remove a fallen tree from the tracks along the line.

Link to comment
Share on other sites

All outdoor stations are closed b.c of the heavy winds from the storm: 

(2) trains start/end at 3 Av-149 St, (5) service is suspended. 

All (3) trains will start/end at Crown Hts-Utica. 

(4) trains will start/end at 149 St-Grand Concourse. 

(6) trains will only run between Hunts Point Av and Brooklyn Bridge - City Hall

(7) trains will only run between Hunters Point Av and 34 St-Hudson Yards.

 

(A) service is all local to/from Euclid Av with the (C) suspended. 

(D)  trains are making local stops between Norwood - 205 St and Broadway-Lafayette St  with the (B) suspended. 
(F) trains are making local stops between Jamaica - 179 St and Jay St - MetroTech.

(G) trains are only running between Court Sq - 23 St and Bergen St. 

(J) trains will only run as a Shuttle between Essex St and Broad St with the (M) suspended. 

The (N) will only run between Lex Av-59 St and 59 St-4 Av via Whitehall St running local as the (W) is suspended. 

(Q) trains will only run between 96 St-2 Av and Canal St making local stops. 

 

Edited by Calvin
1 service and L is affected as well
Link to comment
Share on other sites

The (Q) could at least run to Whitehall. As for the (N), that could be suspended with (R) running instead (existing (N) on the road converted to (R) service). To end at 59 Street requires a relay outdoors.

As for the (D), that can run to 2 Avenue.

Also, the (1) is starting and ending at 191 Street, bypassing 125 Street, and the last stop outbound for (L) trains is Myrtle-Wyckoff.

Edited by aemoreira81
Link to comment
Share on other sites

Just now, paulrivera said:

I'm fairly certain those trains are running light above ground where possible, but they absolutely wont be carrying passengers.

Except for the (1) over Manhattan Valley, but bypassing 125 Street. As for winds, JFK Airport was reporting hurricane-force gusts...which prompted this decision.

Also, because of a signal malfunction, the (G) isn't running south of Bedford-Nostrand.

Link to comment
Share on other sites

For now, the (Q) is only to/from Atlantic Av-Barclays Center via the (R) line. 

Also, outdoor stations have resumed slowly as (5) trains start/end at E.180 St heading to Brooklyn College with the (2) . 

Edited by Calvin
Link to comment
Share on other sites

I was in the middle of editing my earlier post and making a list earlier with all the open portions. Just as I was done, and was ready to post, the power went out , and so did my wifi. Not doing it again because I still don't have power, and I want to preserve the battery on my phone. Also, I'm typing on my phone with uber-slow data. Might actually need to go out to charge my phone later...

 

Link to comment
Share on other sites

MULTIPLE IMPACTS  Posted: 08/09/2020  4:27PM

While crews work to correct a signal malfunction and reduce congestion at Crown Hts - Utica Av, the following service changes are in effect:
Some Utica Av-bound (4) trains are ending at Bowling Green.
Some Bowling Green-bound (5) trains are running on the (2) line from 149 St - Grand Concourse to Chambers St then on the (1) line ending at Rector St.
Expect longer waits on (1)(2)(4) and (5) trains.  

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.