When a gleaming new subway station opened at South Ferry in 2009, at a cost of over $500 million, its rickety forebear faded into retirement beneath the streets of Lower Manhattan.

 
But on Tuesday, more than three months after Hurricane Sandy hit Manhattan and doomed the new station to what could be a three-year rebuilding job, officials said its predecessor could be called back into service as a temporary replacement.
 
“We can’t have the impacts that people are experiencing today take many months,” Thomas F. Prendergast, the interim executive director of the Metropolitan Transportation Authority, said at a City Council hearing on Tuesday. “That’s just too hard.”
 
South Ferry is the last stop on the No. 1 train and a critical connection for Staten Island Ferry riders. In its absence, commuters must either walk to the No. 1 at Rector Street, use the R train at Whitehall Street, or take the No. 4 or 5 train at Bowling Green.
 

Read More:
http://www.nytimes.com/2013/02/13/nyregion/mta-may-reopen-old-south-ferry-station-temporarily.html?partner=socialflow&smid=tw-nytmetro&_r=0

Link to comment
Share on other sites


  • Replies 194
  • Created
  • Last Reply

I say keep it closed and let passengers use the alternatives.  The amount of money that would be needed to rehab the old South Ferry station would not be worth it.  I'm not seeing how this is any different from the other stations down there that were closed like Cortlandt St.

 

The station is quite intact, and the alternatives won't be able to support the ridership for long. Cortlandt Street was more or less destroyed in the 9/11 attacks, and they plan to reopen it in the future anyway, so that doesn't really count. It is in the middle of Ground Zero, after all.

Link to comment
Share on other sites

The station is quite intact, and the alternatives won't be able to support the ridership for long. Cortlandt Street was more or less destroyed in the 9/11 attacks, and they plan to reopen it in the future anyway, so that doesn't really count. It is in the middle of Ground Zero, after all.

You make it sound like they can open the old South Ferry in a giffy and poof all is well, when in fact that is not the case.  I used to use the old South Ferry station for years and it was dark and cramped.  That station was not just left as is.  It was demoed partially so they would have to re-do that station at least cosmetically and then some.  I'm sure the re-do would cost millions and I think that money can be better spent elsewhere, not unless the (MTA) can be reimbursed for it through insurance claims.  If that's the case and it doesn't cost them anything, then sure go on ahead and get the station up and running, but it shouldn't be done on taxpayer dollars.

Link to comment
Share on other sites

>Inb4 Wallyhorse and his idea to restore the Bowling green-south ferry shuttle.

 

 

Anyways, i think this is a good idea. I mean, 3 years is a very long time and a huge inconvenience to those that take the ferry and need 7th ave service daily. Even though restoring the decommissioned station might be costly, it would be a good investment to have for future G.O's needing the new south ferry closed. 

Link to comment
Share on other sites

What about elderly or disabled people that can't make that ''little extra walk''?

 

Well, there is no elevator/escalator at the old station anyway since IIRC, it was never ADA accessible....(this is just assuming that some of said folks can actually walk up the stairs)

 

If not, you got the M5, M15 & M20(which runs alongside/near the (1) and the (R), which I believe Whitehall has both.

 

I swear, people(not you) keep forgetting that the (R) actually goes there too.....

Link to comment
Share on other sites

What about elderly or disabled people that can't make that ''little extra walk''?

I guess your forgot about those with Wheelchairs....

 

South Ferry Loop Terminal isn't an ADA Accessible Station, unlike the 2009 one. So I don't know if that will need to be included in the restoration. Yeah you can grab the (4)(5) and (R) Trains, which already have elevators... But who knows if Disbaled riders will not be happy for no direct ADA (1) access. The bus is also an alternative, but I don't know the numbers of wheelchair passengers, or those who really want to use an elevator to get in the Subway.

 

BTW I do a lot of walking, and it doesn't bother me to walk, if the loop remains closed.. Everyone else, alternaives are already in place. But whatever floats the T/A....

Link to comment
Share on other sites

I guess your forgot about those with Wheelchairs....

 

South Ferry Loop Terminal isn't an ADA Accessible Station, unlike the 2009 one. So I don't know if that will need to be included in the restoration. Yeah you can grab the (4)(5) and (R) Trains, which already have elevators... But who knows if Disbaled riders will not be happy for no direct ADA (1) access. The bus is also an alternative, but I don't know the numbers of wheelchair passengers, or those who really want to use an elevator to get in the Subway.

 

BTW I do a lot of walking, and it doesn't bother me to walk, if the loop remains closed.. Everyone else, alternaives are already in place. But whatever floats the T/A....

I include wheelchair in disabled people. 

Link to comment
Share on other sites

You never said Wheelchair. But regardless, you may need an elevator at the loop (Dk how that will work..), even if alternatives are in place. You don't want to hear Wheelchaired (1) passengers (again don't know the numbers) complaining for no direct access to the line. Yeah it may not happen so soon, but who knows if that I'll happen. People always complain for so much BS, even the littlest.

Link to comment
Share on other sites

You make it sound like they can open the old South Ferry in a giffy and poof all is well, when in fact that is not the case.  I used to use the old South Ferry station for years and it was dark and cramped.  That station was not just left as is.  It was demoed partially so they would have to re-do that station at least cosmetically and then some.  I'm sure the re-do would cost millions and I think that money can be better spent elsewhere, not unless the (MTA) can be reimbursed for it through insurance claims.  If that's the case and it doesn't cost them anything, then sure go on ahead and get the station up and running, but it shouldn't be done on taxpayer dollars.

 

Two thumbs up, I have to agree with you on this one.

 

As was discussed to the point it was akin to beating a dead horse before, according to transit worker inside information even though the tracks and signals itself is in good working order for (2) and (5) turnarounds to it's respective IRT trunk lines, the station itself was already dismantled. No booths, no fare collection system in place, platform gates dismantled, and the station has to be modified to ADA accessibility standards. Which is costly and will take several months maybe even up to a year!! But the fact that some officials in the MTA is even considering this says alot because they all well know how much of a gartuntian like engineering effort it will take to rebuild the new South Ferry Station and get it going again in 3 years.

 

Originally my arguement was to keep the loop closed but every time the MTA has it's press confrences with the media they paint an ever more gloomy picture of what to expect in terms of cost to bring back the new South Ferry Station in 3 years as a projected date. It may even take longer than that. So yes indeed the costs in overhauling the old South Ferry Station are high, but so is the costs of rebuilding the new one without any travel alternatives to the SI Ferry. It's a catch 22 VG8. No matter where the MTA goes with this it's going to hurt our wallets and pocketbooks in terms of tax dollars.

 

They are even considering shuttle bus service as an alternative, but it is not feasible due to capacity problems, so that's off the table. So they have two options, as we wait for the reconstruction of the new SF station, that will cost us in tax dollars regardless: 1) Do nothing or 2) Overhaul and reopen the old SF loop.

 

No foamerizm here guys,I am just giving you my usual angry straphanger extremist point of view. Have a nice day.

Link to comment
Share on other sites

You never said Wheelchair. But regardless, you may need an elevator at the loop (Dk how that will work..), even if alternatives are in place. You don't want to hear Wheelchaired (1) passengers (again don't know the numbers) complaining for no direct access to the line. Yeah it may not happen so soon, but who knows if that I'll happen. People always complain for so much BS, even the littlest.

 

 

I read the article and it said the station only can serve the first 5  cars, and that's my only issue. Trains will be overcrowded, so what I was thinking is that they'll need to extend the station to accomodate all 10 cars and make it wheelchair accessible when they extend it.

Link to comment
Share on other sites

I read the article and it said the station only can serve the first 5 cars, and that's my only issue. Trains will be overcrowded, so what I was thinking is that they'll need to extend the station to accomodate all 10 cars and make it wheelchair accessible when they extend it.

Thats why the 2009 South Ferry was opened, to handle more cars. The Old loop can't be extended. Even if it were possible, you will have gaps around.

I heard the gap fillers were removed from the old loop station, so I don't think they should reopen it.

I also heard the fare control was removed.
Link to comment
Share on other sites

Like i said before: if the politicians demands the loop platform to reopen, chances are it probably will. Never discount political pressure especially when you have a bunch of commuters bitching for some sort of normalcy.

And it would not surprise me the (MTA) would be reopening the station under the threat of being taken to court if they didn't. 

 

Of course, I would never have closed the old station in the first place, but rather had the necessary ADA work done there and at Bowling Green to turn the station over to the Lexington line once the current South Ferry station opened for the (1), with the BG-SF shuttle weekdays from 5:30 AM-approximately 7:30-9:00 PM, the (6) at all other times terminating at old SF and the (5) joining it when not running to Brooklyn.  Currently in that setup, the (1) would obviously be also running there.

 

Also, there was a plan (I would assume before the current (1) station was built) that would have actually extended the old station as noted here (WARNING! PDF File):

 

http://www.mta.info/capconstr/sft/documents/figures/fig08_platform_extension_alernative%20.pdf

Link to comment
Share on other sites

And it would not surprise me the (MTA) would be reopening the station under the threat of being taken to court if they didn't. 

 

Of course, I would never have closed the old station in the first place, but rather had the necessary ADA work done there and at Bowling Green to turn the station over to the Lexington line once the current South Ferry station opened for the (1), with the BG-SF shuttle weekdays from 5:30 AM-approximately 7:30-9:00 PM, the (6) at all other times terminating at old SF and the (5) joining it when not running to Brooklyn.  Currently in that setup, the (1) would obviously be also running there.

 

Also, there was a plan (I would assume before the current (1) station was built) that would have actually extended the old station as noted here (WARNING! PDF File):

 

http://www.mta.info/capconstr/sft/documents/figures/fig08_platform_extension_alernative%20.pdf

Must've been a while ago as the (9) was still in use.

Link to comment
Share on other sites

I read the article and it said the station only can serve the first 5  cars, and that's my only issue. Trains will be overcrowded, so what I was thinking is that they'll need to extend the station to accomodate all 10 cars and make it wheelchair accessible when they extend it.

Which is impossible due to switches at both ends of the station.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.