Jump to content
Attention: In order to reply to messages, create topics, have access to other features of the community you must sign up for an account.
Sign in to follow this  
Turbo19

Amtrak completes bridge replacement project

Recommended Posts

Amtrak completed its three-year Niantic River Bridge Replacement Project, providing improved operational reliability for rail passengers along the Northeast Corridor with increased train speeds, less disruption to the boating community and expanded beach access to area residents.

The original span was built in 1907. The new bridge continues to serve as a key link for passenger and freight rail traffic between New York and Boston, carrying 54 trains daily (38 Amtrak intercity trains, 2 freight trains and 14 commuter trains).

“The replacement of the Niantic Bridge is a positive step in modernizing and enhancing critical rail infrastructure along the Northeast Corridor that supports the regional economy,” said Amtrak President/CEO Joe Boardman.

 

Read More: Source

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.