46Dover

Question about Secaucus Transfer

Recommended Posts

I have to ask, what was the idea of having 4 platforms on the Northeast Corridor section of Secaucus Transfer station? Wouldn't it have made sense to have the regular two local platforms with the middle two tracks open for non stop trains?

Share this post


Link to post
Share on other sites

I believe the concept was that should something happen at penn station or in the tunnels to penn, then Secaucus could be used as a temporary terminus where people could transfer to shuttles that would take them to Hoboken.

Share this post


Link to post
Share on other sites

i agree with the above because during the football game, i think there one or two game trains that can terminate there for Connecticut  game goers.

 

There is one more input that in my head. If the train have mechanical problem at secaucus junction they can use the other tracks without interrupting the other direction. 

It also can be what Amtrak told the Nj this is how it should be built. (Just a wild guess)

 

One other thing it three platforms not 4. one middle island and 2 side platforms. 

Edited by pjbr40

Share this post


Link to post
Share on other sites

I have to ask, what was the idea of having 4 platforms on the Northeast Corridor section of Secaucus Transfer station? Wouldn't it have made sense to have the regular two local platforms with the middle two tracks open for non stop trains?

 

The station is designed for 3-1 operation, so the 2 inner tracks are used to "stag" trains during the peak hour incase there is delay, while one outside track is used for expresses and Amtraks, the other is used for reverse peak trains (both stop and non-stop).A typical AM Rush hour set up would be Eastbounds stopping on track A & occasionally B (inner tracks) with express trains bypassing the station on track 2 and reverse peak trains stopping on 3, process is reversed in the evening. It also is designed for the station to serve as terminal simultaneously while providing thru service,if need to be.

Edited by Jamaica Express
  • Upvote 2

Share this post


Link to post
Share on other sites

 

 

One other thing it three platforms not 4. one middle island and 2 side platforms.

 

You are correct, I stand corrected

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.