Q113 LTD Posted April 7, 2016 Share #1 Posted April 7, 2016 Youtube channel: BARTable BART is now one step closer to providing much needed capacity relief with the arrival of its first new train car now set to begin a crucial onsite testing phase. The first train car was unveiled today at BART’s testing facility in Hayward, marking the beginning of the arrival of a new fleet of 775 train cars over the next five years. “This next testing phase is critical to having safe and reliable new train cars,” said Board President Tom Radulovich. “As these new cars arrive and get approved for passenger service, we can finally start running longer trains. That’s something every line on our system needs right now. In fact, the need is so great we’ve been able to get the manufacturer to increase the monthly delivery rate from 10 cars per month to 16 per month, putting the final car delivery 21 months earlier than the original schedule.” Testing Details The first car will now undergo mandated testing on a test track where dynamic qualification testing of 29 separate performance measures will occur. The first dynamic performance tests are for propulsion and brakes. Then other important features such as wheel to axle resistance, noise, and electromagnetic compatibility testing must be verified. These tests are performed under a variety of weight patterns to reflect an empty car weight, seated passenger weight, and other variables including very crowded conditions. The next testing phase will then occur on BART’s mainline system during the overnight hours when BART isn’t open for passenger service. This includes 16 qualification tests that need to be completed before the California Public Utilities Commission can certify the trains to carry passengers. BART is working towards a target date of December 2016 for passenger service if testing goes well and no major re-engineering is required. Train Car Details “The car is chock full of modern amenities based on feedback from our riders,” said BART General Manager Grace Crunican. “Whether your ride is an hour or 10 minutes, we’ve worked to include features that will help make everyone’s ride easier and more comfortable.” The very first car, train car 3001, was delivered in March on a flatbed truck after a 3600 mile road trip from Plattsburgh, N.Y., where the cars are being assembled by Bombardier Transportation Corp., which was awarded the $2.5 billion contract in 2012. 775 new train cars are on order, but our goal is to find the funding to bring that number up to 1,081 - increasing the number of seats in the fleet by 49%. Source: http://www.masstransitmag.com/video/12191679/first-test-car-arrives Link to comment Share on other sites More sharing options...
DS4Ever Posted April 10, 2016 Share #2 Posted April 10, 2016 Looks a lot like the airtrain Seeing this video footage of a train car atop a truck carrier how come ive never seen any and i mean any MTA subway cars in street i mean do the assemble the trains at the yards and receive the parts unassemble or do they just disclose the car with a truck shell Link to comment Share on other sites More sharing options...
rbrome Posted June 28, 2016 Share #3 Posted June 28, 2016 The MTA should be doing videos like this to get the NYC public excited about new trains. I mean why not? It would get picked up by the local news like crazy. Link to comment Share on other sites More sharing options...
XcelsiorBoii4888 Posted March 12, 2017 Share #4 Posted March 12, 2017 I can already tell BART is having problems with the new cars (seems like Bombardier issues), the first train was supposed to start service last year, and its already March without a single run in service. I wonder how the delivery is going compared to the MTA with the R179s. Sent from my iPhone using Tapatalk Link to comment Share on other sites More sharing options...
BreeddekalbL Posted March 22, 2017 Share #5 Posted March 22, 2017 Like i mentioned in the 179 BBD is taking L's left and right first the 179 next toronto light rail now this http://www.eastbaytimes.com/2017/03/03/testing-hiccups-slows-rollout-of-barts-new-train-cars/ Link to comment Share on other sites More sharing options...