On that subject, Wallyhorse, we heard you the first time. Repeated posts that say practically the same thing are not necessary. Subsequent posts in this regard are subject to deletion without explanation. But I will touch upon this oft-mentioned claim of clout. If the Upper East Side had all this clout and pull for additional service via 2nd Avenue, why would they settle for a so-called T train that runs abysmal headways during peak periods, the time when most people in that area would actually use the subway? Just some food for thought...

The idea is they would want the additional service on the SAS, especially late nights and weekend when it would double the amount of trains on the SAS (since the Broadway and 6th Avenue lines stop within a block of each other until south of 23rd Street and again (albeit a long block) in Soho at Broadway-Lafayette and Prince Street respectively).  It would not be "settling," as some simply would want the additional overall service (boosting the amount of SAS trains overall to 19-20 TPH at peak times).  Having the option would be very important to some even if it's not the main one.

 

Not everyone only uses the trains in rush hours, and I suspect the Broadway-Brooklyn line will be packed with a lot of displaced (L) riders (BOTH on the (J) / (Z) and (M) lines) at all times, not just rush hours.

 

As for Queens Plaza, I agree on the issues there, especially with not wanting to delay CBTC work on weekends any further than necessary. 

Link to comment
Share on other sites


  • Replies 1k
  • Created
  • Last Reply

The idea is they would want the additional service on the SAS, especially late nights and weekend when it would double the amount of trains on the SAS (since the Broadway and 6th Avenue lines stop within a block of each other until south of 23rd Street and again (albeit a long block) in Soho at Broadway-Lafayette and Prince Street respectively).  It would not be "settling," as some simply would want the additional overall service (boosting the amount of SAS trains overall to 19-20 TPH at peak times).  Having the option would be very important to some even if it's not the main one.

 

Not everyone only uses the trains in rush hours, and I suspect the Broadway-Brooklyn line will be packed with a lot of displaced (L) riders (BOTH on the (J) / (Z) and (M) lines) at all times, not just rush hours.

 

As for Queens Plaza, I agree on the issues there, especially with not wanting to delay CBTC work on weekends any further than necessary. 

If they really want 19-20 TPH, then why not just run extra (N) 's and (Q) 's on weekdays?

 

I see no reason to split the (M) at such terrible frequencies...

Edited by Around the Horn
Link to comment
Share on other sites

Well, for one, running 20 trains per hour on the (N) and (Q) would severely over-serve the lines downstream. Car availability issues notwithstanding, the Brighton and Sea Beach lines will not be able to handle a service increase of that magnitude, not with the amount of merges both lines make through their journeys to and from Coney Island. Secondly, is there really a demand for all this? Third and probably most important as it pertains to this discussion, is the fact that 2nd Avenue is not the intended beneficiary for this expansion of (M) service. Those additional (M) trains that cannot or will not run to 71 Avenue need a viable terminal and 96 Street provides just that terminal. Yes, there will be some riders along 2nd Avenue that will benefit from the (M) service expansion, but that's not the end goal. The idea is to get as many displaced (L) line riders to/from Manhattan as possible via the (M). That's it. Everything else is supplemental and likely irrelevant.

 

@Wallyhorse: By the way, your math is wrong. According to the newly released (Q) schedule, the 2nd Avenue line will see 8-9 trains per hour during peak periods. Adding your three T trains will give you a net total of 11-12 trains along the line, nowhere near the 20 trains you envision. Also, while weekend ridership is on the rise, peak hour ridership has been and will likely remain much higher than it is on the weekends. That's why it makes little sense to have more service on weekends than on weekdays.

Link to comment
Share on other sites

Well, for one, running 20 trains per hour on the (N) and (Q) would severely over-serve the lines downstream. Car availability issues notwithstanding, the Brighton and Sea Beach lines will not be able to handle a service increase of that magnitude, not with the amount of merges both lines make through their journeys to and from Coney Island. Secondly, is there really a demand for all this? Third and probably most important as it pertains to this discussion, is the fact that 2nd Avenue is not the intended beneficiary for this expansion of (M) service. Those additional (M) trains that cannot or will not run to 71 Avenue need a viable terminal and 96 Street provides just that terminal. Yes, there will be some riders along 2nd Avenue that will benefit from the (M) service expansion, but that's not the end goal. The idea is to get as many displaced (L) line riders to/from Manhattan as possible via the (M). That's it. Everything else is supplemental and likely irrelevant.

 

@Wallyhorse: By the way, your math is wrong. According to the newly released (Q) schedule, the 2nd Avenue line will see 8-9 trains per hour during peak periods. Adding your three T trains will give you a net total of 11-12 trains along the line, nowhere near the 20 trains you envision. Also, while weekend ridership is on the rise, peak hour ridership has been and will likely remain much higher than it is on the weekends. That's why it makes little sense to have more service on weekends than on weekdays.

Except in my split, the (M) (or (T) ) is during the week a supplemental line while late nights and weekends, ALL such trains would run to 96th/2nd.  The weekdays trains are the excess that can't use QB (or would make the already problematic conga line going to 71-Continental worse) and use up the remaining capacity on the Williamsburg Bridge while late nights and weekends, 96th-2nd would serve as thole sole northern terminal for the (M), which is why you actually have a higher number of trains in my version (either as (M) or (T) running to 96th/2nd on Saturdays and Sundays than weekdays.

 

And based on my experiences riding the M15 on a lot of Saturdays in NYC, I suspect having the additional SAS service will help.  That, however, is simply a side benefit of the main purpose, that is getting (L) riders to Manhattan.

 

And thanks for the correction on the schedules.  I had seen 14 (Q) trains per hour.  The 8-9 (Q) trains and five (M) or (T) trains per hour would mean 13-14 total at 96th/2nd at peak hours while on weekends, assuming six (Q) TPH and 6-7 M/T per hour, you would have 12-13 trains per hour on the SAS on weekends (and 6 TPH late nights between two lines), which I think will prove to be needed even if its not the intended purpose given how densely populated the UES really is.

Edited by Wallyhorse
Link to comment
Share on other sites

Either way, this is a temporary service change, even if it is slated to last for 18 months. That's why it's easier to have them run as extra (M) trains, as opposed to creating an entirely different line that would likely be eliminated once the work is done.

Link to comment
Share on other sites

Either way, this is a temporary service change, even if it is slated to last for 18 months. That's why it's easier to have them run as extra (M) trains, as opposed to creating an entirely different line that would likely be eliminated once the work is done.

It is supposed to be temporary, but I suspect, especially on weekends that may very well become permanent even after the (L) returns to normal because I suspect UES riders will want the additional trains to 96th/2nd since 6th avenue trains as noted stop within one block of Broadway line trains until south of 23rd (plus except late nights the (Q) doesn't stop at 23rd anyway) and also in Soho at Broadway-Lafayette (Houston) and Prince and Broadway respectively.  This also gives UES riders looking to go to Greenwich Village for example a one-seat ride.

 

Of course, the real purpose is to get displaced (L) riders to Manhattan, but I somehow suspect enough UES riders will want this to be made permanent, hence the (T) lettering.  

Link to comment
Share on other sites

It is supposed to be temporary, but I suspect, especially on weekends that may very well become permanent even after the (L) returns to normal because I suspect UES riders will want the additional trains to 96th/2nd since 6th avenue trains as noted stop within one block of Broadway line trains until south of 23rd (plus except late nights the (Q) doesn't stop at 23rd anyway) and also in Soho at Broadway-Lafayette (Houston) and Prince and Broadway respectively. This also gives UES riders looking to go to Greenwich Village for example a one-seat ride.

 

Of course, the real purpose is to get displaced (L) riders to Manhattan, but I somehow suspect enough UES riders will want this to be made permanent, hence the (T) lettering.

Not if it runs only once every 12-15 minutes during rush hours. And a service running on such abysmal rush hour headways could leave a bad taste for the (T) in riders' mouths in the long run should we ever get funding for SAS phases 3 and 4.
Link to comment
Share on other sites

And it won't even be a well-used service, because in order for a subway service to be popular, it has to run relatively frequently in addition to serving major destinations. Frequencies of 12-15 minutes during rush hours might be great for suburban commuter trains, but for NYC subway lines, it just doesn't cut it.

Link to comment
Share on other sites

And it won't even be a well-used service, because in order for a subway service to be popular, it has to run relatively frequently in addition to serving major destinations. Frequencies of 12-15 minutes during rush hours might be great for suburban commuter trains, but for NYC subway lines, it just doesn't cut it.

 

Agreed. Most passengers will just take the next train, which most likely will be a (Q). I'd assume that's also why, apart from apps that rely on GTFS data, the (N) trips to 96th Street are not advertised...

 

Shifting gears back to the impending 14th Street Tunnel closure, is there already a program in the system for the (L) to Bedford Av, or will they have to make one just for the closure?

Link to comment
Share on other sites

Agreed. Most passengers will just take the next train, which most likely will be a (Q). I'd assume that's also why, apart from apps that rely on GTFS data, the (N) trips to 96th Street are not advertised...

 

Shifting gears back to the impending 14th Street Tunnel closure, is there already a program in the system for the (L) to Bedford Av, or will they have to make one just for the closure?

Programmatically (within the apps), I assume routes are best represented internally as a tuple of two endpoints rather than a single letter. The letter is just a garnish on the side for the users who know only about the letter routes. As a programmer, I find it bothersome to deal with ambiguous specifications since computers demand rigorously defined behaviors.

Edited by CenSin
Link to comment
Share on other sites

Agreed. Most passengers will just take the next train, which most likely will be a (Q). I'd assume that's also why, apart from apps that rely on GTFS data, the (N) trips to 96th Street are not advertised...

 

Shifting gears back to the impending 14th Street Tunnel closure, is there already a program in the system for the (L) to Bedford Av, or will they have to make one just for the closure?

There is. One for each direction:

 

(From Manhattan)

BEDFORD AV

SHUTTLE

 

(From Canarsie)

BEDFORD AV

LOCAL

Link to comment
Share on other sites

Agreed. Most passengers will just take the next train, which most likely will be a (Q). I'd assume that's also why, apart from apps that rely on GTFS data, the (N) trips to 96th Street are not advertised...

 

Shifting gears back to the impending 14th Street Tunnel closure, is there already a program in the system for the (L) to Bedford Av, or will they have to make one just for the closure?

I would think there would have to be programs to Bedford Avenue and/or Lorimer St. in case one or the other has to be used for an emergency currently.

 

As far as the (M) / (T) on the SAS, again, that's more a supplement to avoid overcrowding on QB during the week and so there is service on 6th Avenue on weekends.  I just happen to think those who are savvy and know the schedule and want 6th Avenue service on the SAS will time it to make such whenever possible.

Link to comment
Share on other sites

I would think there would have to be programs to Bedford Avenue and/or Lorimer St. in case one or the other has to be used for an emergency currently.

 

As far as the (M) / (T) on the SAS, again, that's more a supplement to avoid overcrowding on QB during the week and so there is service on 6th Avenue on weekends. I just happen to think those who are savvy and know the schedule and want 6th Avenue service on the SAS will time it to make such whenever possible.

Or one could take the (Q) to 63rd street for the (F) or 34th street for the (M)(B)(D)

Link to comment
Share on other sites

True, but I was thinking more Rockerfeller Plaza and the massive underground concourse at 47-50. 

 

They can take the (Q) to 63rd, walk a total of twenty feet across the platform, and get on an (F) to Rockefeller.

 

People don't wait around for infrequent variations in service. No one waits for the (E) to 179; no one waits for the odd Brooklyn IRT train that goes to the wrong terminal.

Link to comment
Share on other sites

They can take the (Q) to 63rd, walk a total of twenty feet across the platform, and get on an (F) to Rockefeller.

 

People don't wait around for infrequent variations in service. No one waits for the (E) to 179; no one waits for the odd Brooklyn IRT train that goes to the wrong terminal.

I see people in the morning at 179th street that specifically wait for the special (E) trains.

Link to comment
Share on other sites

  • 4 weeks later...

When the (L) starts terminating at Bedford Av, will it still be CBTC operation, or will it be manually operated? I don't think high frequency is necessarily needed for ATO, but I'm just wondering.

The current day (L) is a mix of both manual operation and ATO under CBTC, It will most likely be the same when the tubes close. Yesterday the (L) was running 8 min headways (Same headways the (L) will have when the tubes close) and the train I took home was running in ATO.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.