Jump to content


Attention: In order to reply to messages, create topics, have access to other features of the community you must sign up for an account.
Sign in to follow this  
Deucey

LA Crenshaw Line update: 5 Green Line stations closing

Recommended Posts

http://thesource.metro.net/2017/12/01/71-day-closure-of-five-green-line-stations-begins-jan-26-to-connect-crenshawlax-line-to-green-line/

I'm trying to understand why they need to close the entire West End since the wye for the LAX connection was already connected to the Green Line with track, switches and pantograph back when the line opened in the 90s.

But it’s almost possible to go from LAX to East NorthEast LA County on one fare.

Share this post


Link to post
Share on other sites

On 12/1/2017 at 11:40 PM, Deucey said:

http://thesource.metro.net/2017/12/01/71-day-closure-of-five-green-line-stations-begins-jan-26-to-connect-crenshawlax-line-to-green-line/

I'm trying to understand why they need to close the entire West End since the wye for the LAX connection was already connected to the Green Line with track, switches and pantograph back when the line opened in the 90s.

But it’s almost possible to go from LAX to East NorthEast LA County on one fare.

Tracks, switches and overhead was not made. only thing made was the roadbed.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.