Deucey Posted December 2, 2017 Share #1 Posted December 2, 2017 http://thesource.metro.net/2017/12/01/71-day-closure-of-five-green-line-stations-begins-jan-26-to-connect-crenshawlax-line-to-green-line/ I'm trying to understand why they need to close the entire West End since the wye for the LAX connection was already connected to the Green Line with track, switches and pantograph back when the line opened in the 90s. But it’s almost possible to go from LAX to East NorthEast LA County on one fare. Link to comment Share on other sites More sharing options...
Deucey Posted December 2, 2017 Author Share #2 Posted December 2, 2017 And if you wanna see Crenshaw Line construction progress: http://thesource.metro.net/2017/11/30/fresh-pics-recent-work-on-the-crenshawlax-line/ Link to comment Share on other sites More sharing options...
theaveragejoe Posted June 18, 2018 Share #3 Posted June 18, 2018 On 12/1/2017 at 11:40 PM, Deucey said: http://thesource.metro.net/2017/12/01/71-day-closure-of-five-green-line-stations-begins-jan-26-to-connect-crenshawlax-line-to-green-line/ I'm trying to understand why they need to close the entire West End since the wye for the LAX connection was already connected to the Green Line with track, switches and pantograph back when the line opened in the 90s. But it’s almost possible to go from LAX to East NorthEast LA County on one fare. Tracks, switches and overhead was not made. only thing made was the roadbed. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.