Another Vehicle Struck By Falling Debris From Subway Station In Queens


Recommended Posts

Another Vehicle Struck By Falling Debris From Subway Station In Queens

March 6, 2019 at 1:21 pm

Filed Under:Local TV, Metropolitan Transit Authority, MTA, New York, Queens, Subway, Woodside

91044A6AAC19474CA5539DDC1FC6714C.jpg?Exp

VIDEO: https://cbsloc.al/2NLYzDU

NEW YORK (CBS NewYork) – For the second time in two weeks, a piece of debris has fallen from an elevated subway and crashed down on a vehicle below.

The car was occupied and in motion at the time of the incident, according to Councilman Jimmy Van Bramer.

Apparently what struck the vehicle was a rusted piece of metal – possibly a piece of metal from a staircase that goes over the street.

https://twitter.com/JimmyVanBramer/status/1103349314447986689/photo/1

“What the hell is going on here,” Van Bramer wrote on Twitter. “No one was injured but someone is going to get killed here @MTA!”

The MTA said they were looking into the incident.

It’s the second time something’s fallen from the station in two weeks.

subway-debris.jpg?w=420&h=236

A piece of debris from the subway tracks smashed through an SUV’s windshield on Fev. 21, 2019. (credit: Facebook/Steven Raga)

On Feb. 21, a wooden plank from the elevated 7 train platform came crashing down on a car driven near 65th and Roosevelt Avenue. The plank pierced the windshield, landing just inches from the driver.

mahboob-lodhi.jpg?w=420&h=236

Livery driver Mahboob Lodhi. (credit: CBS2)

“Yeah, I’m lucky,” Uber driver Mahboob Lodhi said. “God blessed me, I’m happy.”

The MTA launched an investigation into the incident and announced that every inch of elevated track – 188 miles in three boroughs – would be inspected.

“I was shocked,” Transit Authority chief Andy Byford said at the time. “This should not have happened.”

Source: https://newyork.cbslocal.com/2019/03/06/subway-debris-hits-vehicle-in-queens/?fbclid=IwAR3HdNpxje5NADTJ4AK4vK8IYPIdsrMF1fsacLMgce9p3znzM6dJ9cGCDAA

 

Link to comment
Share on other sites


18 hours ago, BreeddekalbL said:

How long till they start thinking of replacing the els like the air train els? 

long time. Even with management changes and whatnot. It'd be a very intense project to completely rebuild century-old els from the ground up, and a line like the (7) has a lot of daily riders – who surely would not take kindly to massive service disruptions and cuts while the structure was rebuilt. Unless you somehow managed to build the el above the current one – or bury the line (which also likely wouldn't happen) I see no replacement happening. Rather, better maintenance and rehabilitation of existing structures is the way to go.

Link to comment
Share on other sites

Exactly. We're looking at this from the wrong angle. Even discounting the extreme costs to rebuild and/or bury the existing elevated lines, they themselves are not the issue here. The problem here is that pieces of the structures are flaking off like dead skin, but unlike dead skin, these rotting pieces of wood, steel and metal are quite dangerous when they fall to the ground, the last two incidents involving such a scenario have proven quite soundly. No. What needs to be done is that the MTA must secure their infrastructure and prevent such incidents from happening in the first place. Whether that involves walking the length of every elevated track both above and below the structures remains to be seen, but they cannot continue to treat this as a one-off occurrence and simply ignore it.

Link to comment
Share on other sites

It'd be likely extremely easy. I'd rather they didn't though because knowing the MTA, they'd install some opaque netting not unlike what they use when they're painting the elevated structures. That netting would stick around forever, gathering all types of dust and grime from the trains above and the cars below and look terrible after about a week. Also, it doesn't fix the problem at hand, but rather just masks it with another. Besides, they'd still have to collect the debris caught in the netting after a while. Otherwise, the netting along with the dangerous debris is going to come down onto the roads below.

Link to comment
Share on other sites

On 3/6/2019 at 4:24 PM, BreeddekalbL said:

How long till they start thinking of replacing the els like the air train els? 

Nice but unnecessary capital project:

Replace the els with concrete viaducts that reduce noise and vibrations, and require fewer stanchions.

Three birds with one stone.

Link to comment
Share on other sites

On 3/7/2019 at 2:10 PM, Enjineer said:

long time. Even with management changes and whatnot. It'd be a very intense project to completely rebuild century-old els from the ground up, and a line like the (7) has a lot of daily riders – who surely would not take kindly to massive service disruptions and cuts while the structure was rebuilt. Unless you somehow managed to build the el above the current one – or bury the line (which also likely wouldn't happen) I see no replacement happening. Rather, better maintenance and rehabilitation of existing structures is the way to go.

Dual Contracts showed Els can be modified without service disruption, Jamaica/Mytle Els. LIRR Atlantic Ave Viaduct was 99% replaced in late 2000s with new welded cast steel structure instead of the old rolled steel and rivetted structure from the 1st grade separation attempt. I think it was 6 months of weekend closures to replace the LIRR El.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.