Jump to content
Attention: In order to reply to messages, create topics, have access to other features of the community you must sign up for an account.
Lawrence St

OMNY Implementation/Metro-Card Retirement Discussion Thread

Recommended Posts

ADD:

Sutter Ave-Rutland Road

Saratoga Ave

Rockaway Ave

Junius St. 

 

 

Three stations remain before the IRT is complete.

Brooklyn Museum (would complete the 2

Utica Ave (would complete the 4)

New Lots Ave

 

So far no additions to the B division... and 57th Street on the Broadway line is still shown as offline. 

Share this post


Link to post
Share on other sites

ADD

Utica Ave

New Lots Ave.

 

The 4 is complete.

the East Side IRT is complete.

The IRT is one station away from being completely online...

 

And still nothing on 57th/7th...

Share this post


Link to post
Share on other sites
2 hours ago, Kamen Rider said:

ADD

Utica Ave

New Lots Ave.

 

The 4 is complete.

the East Side IRT is complete.

The IRT is one station away from being completely online...

 

And still nothing on 57th/7th...

What about 57th/6th and 53rd & 5th?

 

Share this post


Link to post
Share on other sites

those weren't left over from last month's list. The Broadway Line station under 7th was supposed to be a June activation, but it's just sat there line.

Share this post


Link to post
Share on other sites

A

57th-7th is finally online.

The N is online north of Atlantic.

The Q is online north of Canal

The R is online between 36th street on the QBL and Jay-Metro tech

And the W is COMPLETE

Share this post


Link to post
Share on other sites

OMNY Active list
 

(1) All Stations 

(2) 241st Street to Grand Army Plaza, Franklin Ave to Flatbush Ave (1 Station) 

(3) 148th Street to Grand Army Plaza, Franklin Ave New Lots Ave (1 Stations) 

(4) All Stations 

(5) All Stations 

(6) All Stations  

(7) All Stations 

(S) 42nd St All Stations (line not in service)  

(A) 207th Street to Euclid Ave, Howard Beach-JFK (20 Stations) 

(C) All Stations 

(E) Sutphin Blvd-JFK, Jackson Heights-Roosevelt Avenue to Lexington Ave/53rd Street, 7th ave to World Trade Center (7 Stations) 

(B) Bedford Park Blvd to Broadway-Lafayette Street, Atlantic Ave, Prospect Park (8 Stations) 

(D) Norwood-205th St to Broadway-Lafayette Street, Atlantic Ave (15 stations)  

(F) Jackson Heights-Roosevelt Avenue, Lexington Ave-63rd St, 47-50th streets to Broadway-Lafayette Street, York St to Jay Street-Metro Tech (34 Stations)  

(M) Jackson Heights-Roosevelt Avenue, 36th Street to Lexington Ave/53rd Street, 47-50th streets to Broadway-Lafayette Street (24 Stations)  

(G) Court Square, Hoyt-Schermerhorn Streets, (19 Stations) 

(L) 8th Ave to Union Square, Broadway Junction (20 stations) 

(N) Astoria-Ditmars Blvd to Atlantic Ave (11 Stations) 

(Q) 96th Street-2nd Ave to Canal street, Atlantic Ave, Prospect Park (18 Stations)  

(R) Jackson Heights-Roosevelt Avenue, 36th street to Jay St-Metro Tech, Atlantic ave, 86th Street, (22 Stations) 

(W) All Stations  

(J)/(Z) Fulton St to Canal St, Broadway Junction, Sutphin Blvd-JFK (25 stations)

(S) Franklin All stations.

(S) Rockaway none (5 Stations)

  • Thanks 4

Share this post


Link to post
Share on other sites

ADD 

Steinway Street.

 

Still no movement on Brooklyn Museum.

Is this a thing? where one station sit's left out? 

  • Upvote 1

Share this post


Link to post
Share on other sites
13 hours ago, Kamen Rider said:

Still no movement on Brooklyn Museum.

Is this a thing? where one station sit's left out? 

Might have something to do with the elevator work at the station and they'll add OMNY later

  • Upvote 1

Share this post


Link to post
Share on other sites

Well, it is now Saturday, August 1st... and I can officially mark the July list as...

 

FAILURE!

Brooklyn Museum is not complete, along with several stations on the Queens Blvd line. 

Share this post


Link to post
Share on other sites

august list is out.

Rest of Manhattan

Rest of the Queens Blvd IND

L train to Bedford Ave.

 

Officially add:

Woodhaven Blvd

Grand Ave

Elmhurst Ave

65th street

Northern

46th street

 

still no movement on Brooklyn Museum

 

  • Upvote 2

Share this post


Link to post
Share on other sites
On 8/1/2020 at 12:11 AM, Kamen Rider said:

 

FAILURE!

Brooklyn Museum is not complete  

I don’t consider it as failure. They are still doing work at The Brooklyn Museum Station. I drove by it over the weekend. Station will get on line once elevators are up and other logistical factors are taken place. 
 

Also, let’s be mindful that these crews are finishing the work ahead of schedule so if they miss a station or 2 we shouldn’t be fussing. Glad that Queens is being worked on and (L) line 

  • Upvote 1

Share this post


Link to post
Share on other sites

Now there a detail mapped about OMNY and it is till the end of August till early September installations:

august-omny-detailed-map.png

Looks like after August FINALLY Brooklyn is next and then it should be all completed and it should be OMNY wide.  Then MTA should introduce the NEW MTA own OMNY card.   Waiting a long time for that.  Don't want to keep using my credit card for OMNY.  It's convenient YES but still prefer MTA own OMNY card so my bank info does not have to be in their system if you know what I mean.. 

Edited by mikecintel
  • Thumbs Up 1

Share this post


Link to post
Share on other sites
On 8/4/2020 at 9:30 AM, Future ENY OP said:

I don’t consider it as failure. They are still doing work at The Brooklyn Museum Station. I drove by it over the weekend. Station will get on line once elevators are up and other logistical factors are taken place.  

What does work on elevators have do to with working on the turnstiles?

On 8/5/2020 at 9:43 PM, mikecintel said:

Looks like after August FINALLY Brooklyn is next and then it should be all completed and it should be OMNY wide.  Then MTA should introduce the NEW MTA own OMNY card.   Waiting a long time for that.  Don't want to keep using my credit card for OMNY.  It's convenient YES but still prefer MTA own OMNY card so my bank info does not have to be in their system if you know what I mean.. 

That’s not how OMNY works, let alone contactless translations at all.

Share this post


Link to post
Share on other sites
On 8/5/2020 at 9:43 PM, mikecintel said:

Now there a detail mapped about OMNY and it is till the end of August till early September installations:

august-omny-detailed-map.png

Looks like after August FINALLY Brooklyn is next and then it should be all completed and it should be OMNY wide.  Then MTA should introduce the NEW MTA own OMNY card.   Waiting a long time for that.  Don't want to keep using my credit card for OMNY.  It's convenient YES but still prefer MTA own OMNY card so my bank info does not have to be in their system if you know what I mean.. 

Wonder why Brooklyn is always last (IIRC, it was the same pattern with Metrocard. Manhattan and Staten Island first, then the Bronx and I think Queens)

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.