An idea to reopen an overgrown commuter rail line to Southeast, N.Y., and create a fast track to Manhattan for Danbury commuters has been awarded a $1 million study grant.

The grant, awarded Thursday by the New York Metropolitan Transportation Council, is the first step in a plan to reopen the old Maybrook rail line from Danbury to Metro-North’s Harlem Line in Southeast.

The idea to cut as much as an hour off Danburians’ commute to New York City was first floated in late April, after a meeting between Danbury Mayor Mark Boughton, Metro-North President Cathy Rinaldi and state DOT Commissioner Joe Giulietti.

The money for the feasibility study comes from an $800,000 federal grant, and a $200,000 contribution from from Putnam County.

Source: https://m.newstimes.com/local/article/Fast-track-concept-from-Danbury-to-Grand-Central-14416547.php?fbclid=IwAR1rOTdm--RL1WvNdNkXWM8mp6DbvYQcF_ZhBmg6UHcpUtFArGpUnTowKjM

Share this post


Link to post
Share on other sites

I like the idea, but think that our money should go to more important things, such as increased frequency of commuter rail service, eliminating bottlenecks (Shell Interlocking), electrifying lines, etc.

  • Upvote 1

Share this post


Link to post
Share on other sites
1 hour ago, Union Tpke said:

I like the idea, but think that our money should go to more important things, such as increased frequency of commuter rail service, eliminating bottlenecks (Shell Interlocking), electrifying lines, etc.

I think the Danbury branch was indeed electrified once upon a time...

Share this post


Link to post
Share on other sites
1 hour ago, paulrivera said:

I think the Danbury branch was indeed electrified once upon a time...

Indeed it was.

Share this post


Link to post
Share on other sites
1 hour ago, paulrivera said:

I think the Danbury branch was indeed electrified once upon a time...


It was. It should be re-electrified (with more direct service from GCT) and extended to New Milford or Kent.

 

  • Upvote 1

Share this post


Link to post
Share on other sites

A $1 million grant to say its going to take $10's of millions to rebuild an obsolete rail line.  It's just another pipe dream for a clueless politician. 

  • Upvote 2

Share this post


Link to post
Share on other sites
4 hours ago, Jova42R said:

It was. It should be re-electrified (with more direct service from GCT) and extended to New Milford or Kent.

Most demand on the branch is intra-corridor; a well built transfer to mainline trains served by frequent shuttles would more than suffice. 

 

  • Upvote 1

Share this post


Link to post
Share on other sites
On 9/6/2019 at 10:34 PM, RR503 said:

Most demand on the branch is intra-corridor; a well built transfer to mainline trains served by frequent shuttles would more than suffice. 

 

You just to grade-separate WALK Interlocking. There are cross-platform transfers at South Norwalk.

  • Upvote 1

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.