Jump to content

Surplus of 8 car trains at ENY


Recommended Posts

As a result of 8th Avenue and Crosstown CBTC, ENY will most likely get ALL 8 car r179's in addition to ALL 8 car r160's and r143's. The total number of 8 car trains will be much higher than the number needed at ENY.

The question is what should the MTA do with all those extra 8 car trains at ENY???

Link to comment
Share on other sites


2 minutes ago, subwaycommuter1983 said:

As a result of 8th Avenue and Crosstown CBTC, ENY will most likely get ALL 8 car r179's in addition to ALL 8 car r160's and r143's. The total number of 8 car trains will be much higher than the number needed at ENY.

The question is what should the MTA do with all those extra 8 car trains at ENY???

With no evidence for saying this, I think the (C) will likely stay 8-car for a while.

Link to comment
Share on other sites

39 minutes ago, subwaycommuter1983 said:

As a result of 8th Avenue and Crosstown CBTC, ENY will most likely get ALL 8 car r179's in addition to ALL 8 car r160's and r143's. The total number of 8 car trains will be much higher than the number needed at ENY.

The question is what should the MTA do with all those extra 8 car trains at ENY???

Send them to the (G)

Link to comment
Share on other sites

11 hours ago, subwaycommuter1983 said:

As a result of 8th Avenue and Crosstown CBTC, ENY will most likely get ALL 8 car r179's in addition to ALL 8 car r160's and r143's. The total number of 8 car trains will be much higher than the number needed at ENY.

The question is what should the MTA do with all those extra 8 car trains at ENY???

 

2 hours ago, LaGuardia Link N Tra said:

Well 2 things can happen: 

- Send a handful of 179’s to the (G) for Crosstown CBTC

- Expand ENY Yard. 

the 8-car 179 fleet should ideally be split between the (J)(Z) and the (G) so that the latter can be full length. besides, it being full length is needed due to increases in ridership. 

expanding ENY Yard is costly and i don't personally think it will happen anytime soon due to the MTA already having the costly burden of the 211 contract, ESA, SAS Phase 2, etc. 

the 143s should stay where they are for (L) service with a few spares for the (J)(Z) if needed. the 160s should either stay where they are or some can also be sent to the (G) alongside the 179s for additional service. 

Link to comment
Share on other sites

2 hours ago, Coney Island Av said:

 

the 8-car 179 fleet should ideally be split between the (J)(Z) and the (G) so that the latter can be full length. besides, it being full length is needed due to increases in ridership. 

expanding ENY Yard is costly and i don't personally think it will happen anytime soon due to the MTA already having the costly burden of the 211 contract, ESA, SAS Phase 2, etc. 

the 143s should stay where they are for (L) service with a few spares for the (J)(Z) if needed. the 160s should either stay where they are or some can also be sent to the (G) alongside the 179s for additional service. 

There are likely not going to be THAT many spare cars, especially with the (L) train service increases coming following the substation construction, and the need to increase the spare factor on all the subway lines, but most likely all R179s will be sent to the (J)(Z), and the remaining R160s that are not used for the (L) CBTC (68 cars) and the (M) CBTC on Queens Blvd (256 cars) can be used as spares (which is about 40 cars only). 

Edited by darkstar8983
Link to comment
Share on other sites

On 1/25/2020 at 12:10 AM, bulk88 said:

Perhaps during a mid life R188 style overhaul, reconfig to 5 car. A-A pairs are always a choice.

It's easy to turn 5 4 car sets (20 cars, 10 A and 10 B) into 3 5 car sets (15 cars, 6 A and 9 B), a 2 car set (AA) and a 3 car set (ABA). Do this twice - turns 10 4 car sets into 6 5 car sets, two 2 car sets, and two 3 car sets. Lengthen Franklin (S) platforms to 180 ft to run the 3 car sets there, and couple the two 2 car sets together to run as a 4 car set (an ABBAAAAA train). If there are maintenance issues on the 3 car sets, can also run the 2 car sets in their place.

This solves the Franklin (S) fleet problem post R68 retirement.

Edited by andreww
Link to comment
Share on other sites

What do you guys think (as a possible solution) about a permanent weekend M extension past Delancey Street perhaps to 145?

More local train service is needed along CPW during the weekends, especially between 59th Street and 86th Street, where these stations are slammed with museum visitors. Keep in mind that track work is being done very often on the 1 line causing more crowding along CPW. 

In the event that weekend track work is being done on CPW, then the M can go to 96th/2nd Avenue.

Edited by subwaycommuter1983
Link to comment
Share on other sites

On 1/27/2020 at 4:26 PM, subwaycommuter1983 said:

What do you guys think (as a possible solution) about a permanent weekend M extension past Delancey Street perhaps to 145?

More local train service is needed along CPW during the weekends, especially between 59th Street and 86th Street, where these stations are slammed with museum visitors. Keep in mind that track work is being done very often on the 1 line causing more crowding along CPW. 

In the event that weekend track work is being done on CPW, then the M can go to 96th/2nd Avenue.

Not likely, since there is work on CPW most weekends anyway. 

Link to comment
Share on other sites

On 1/27/2020 at 1:26 PM, subwaycommuter1983 said:

What do you guys think (as a possible solution) about a permanent weekend M extension past Delancey Street perhaps to 145?

More local train service is needed along CPW during the weekends, especially between 59th Street and 86th Street, where these stations are slammed with museum visitors. Keep in mind that track work is being done very often on the 1 line causing more crowding along CPW. 

In the event that weekend track work is being done on CPW, then the M can go to 96th/2nd Avenue.

Wildly different weekend terminals on trains is confusing to riders.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.