A37121
ADA: COURT SQUARE / CROSSTOWN (ELEVATOR PHASE)
$5M - $10M

This Design/Build project is to provide full ADA accessibility at the Court Square Station in the Borough of Queen. Work will include:

Excavate and construct new Control Area with street to mezzanine elevator
Provide a Head House for elevator on the sidewalk in front of Court Square Park
lnstall one Street to Mezzanine and one Mezzanine to Platform elevator and construct Elevator Machine Rooms and install equipment for elevator functions.

 

A37342/A35309/A37129/A37310
ADA ACCESSIBILITY, PLATFORM COMPONENTS AND STATION RENEWAL/6 AV/7 AV
$10M - $50M

The proposed work is for eliminating defects at the 14th St station, providing full accessibility at the stations, improving the overall safety and appearance of the selected stations, rehabilitating/enhancing lighting, and improving security and safety, and also new artwork an comprehensive painting.

Work will include vertical accessibility, work on platform, mezzanine, and interior stair components, miscellaneous component work.
The project will install street elevators at the station.
Various platform component repairs for the 14th St Station complex, including platform columns.
Project will also construct new street stairs, and the station will be painted.

 

A36164
ADA: 68 ST-HUNTER COLLEGE / LEXINGTON*
OVER $50M

This Design/Build project is to provide full ADA accessibility at the 68th Street-Hunter College Station on the IRT Lexington Avenue Line located in the Borough of Manhattan. Work will include:

Install three (3) elevators
Widen or reorient existing street stairs
Expand mezzanine
Construct two new entrances from street level to platforms
Add other ADA progressive elements
Duration of Contract 33 Months

A37139
ADA: 95TH ST / 4AV
$10M - $50M

The proposed work will provide ADA compliant elevators and associated facilities, reconfigure existing mezzanine and station facilities.

The project will include but not be limited to the following: improve vertical accessibility, provide an accessible travel route, modify platforms to reduce gaps, install tactile warning strips,
Project will provide ticketing units (with two-way communication system), TTYs, PA/CIS system
Project will also provide signage that includes braille and tactile lettering, trailblazing, and boarding area signage with the ISA symbol, in addition to public toilets that will be brought into ADA compliance if modified
Duration of Contract 33 Months

 

P36708
NEW SUBSTATION: CANAL STREET / 8TH AVENUE
$10M - $50M

This Design/Build project is to construct a new substation serving the IND, 8th Avenue Line around Canal Street and 8th Avenue in the borough of Manhattan in order to provide traction power for reliable train operations on the 8th Avenue Line. Work will include:

Equipping the new substation enclosure with power transformers, rectifiers, high tension switchgear and DC switchgear.
Furnishing and installation of new power equipment consisting of two (2) 3000KW silicon diode rectifiers, and two (2) traction power transformers.
Duration of Contract 39 Months

C34924
SANDY MITIGATION: STEINWAY PORTAL(9 STNS BK/Q INITIATIVE)**
$10M - $50M

This project will construct flood mitigation measures to protect the Steinway tunnel portal on the Flushing Line in the borough of Queens.

Work will include constructing retaining walls on both sides of the Steinway tunnel portal. Two walls are 25 feet long by 15 feet high reinforced concrete capable of withstanding a CAT+3 flood.
Piles, pile caps, footings and substructures as necessary to support the new flood walls and flex gates
Install ILC Dover Flex Gates at the face of new walls to mitigate flood water entering the tunnel.
Construct lateral struts between walls to improve wall performance and minimize substructures.
Seal all duct and conduit openings to prevent water infiltration.

 

http://web.mta.info/mta/capital/eotf-descrip.htm#nyct

Link to comment
Share on other sites


Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor