Well, it's taken them almost a decade to get around to this... the phrase 'lessons learned from the Canarsie Project' makes me suspicious- makes it sound like the Governor's Office is pushing them to use the "experimental" construction methods from the (L) project.

Hopefully (MTA) applies the lesson learned from the Montague tunnel clearance screw-up; measure twice, cut once. 

Share this post


Link to post
Share on other sites

To be fair, there is nothing wrong with racking itself.

Using it to get around fully replacing bench wall? Only time will tell.

Share this post


Link to post
Share on other sites

So, will this prevent vintage cars from running via Rutgers? I don't recall whether the racking has the same issue as the Montague rebuild, where the reduced clearance prevents pre-R46 cars from going through the area safely.

Share this post


Link to post
Share on other sites

Montague's issue was with cabling toward the top. The racking is on the side.

Share this post


Link to post
Share on other sites

Aren't the racked wires going to be complete FUBAR in both Rutgers/Canarsie if there's another tunnel flood (not unlikely)? Seems like they're uniquely susceptible to damage in a way that the bench walls were not.

  • Upvote 1

Share this post


Link to post
Share on other sites
55 minutes ago, MHV9218 said:

Aren't the racked wires going to be complete FUBAR in both Rutgers/Canarsie if there's another tunnel flood (not unlikely)? Seems like they're uniquely susceptible to damage in a way that the bench walls were not.

On the contrary, they make damaged equipment hugely easier to repair. You don't have to demolish the bench wall to replace the conduit that got a little water in it. 

  • Upvote 1

Share this post


Link to post
Share on other sites
3 minutes ago, RR503 said:

On the contrary, they make damaged equipment hugely easier to repair. You don't have to demolish the bench wall to replace the conduit that got a little water in it. 

I suppose what I meant was, doesn't it virtually guarantee equipment will be damaged, whereas an effective bench wall should theoretically provide cover? Though I suppose historically that didn't really happen...

 

Share this post


Link to post
Share on other sites
2 hours ago, MHV9218 said:

I suppose what I meant was, doesn't it virtually guarantee equipment will be damaged, whereas an effective bench wall should theoretically provide cover? Though I suppose historically that didn't really happen...

 

Really, no matter what you do, it takes one tiny small point of failure to stop components from flooding in a tunnel, at the lowest point of an underground system.

Based on observed realities and the facts of the situation it is much better to make things fail fast and easy to repair.

  • Upvote 1

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.