nah some will stick longer till the R179 makes wave, seeing that the contract is almost over with the 160s THANK GOD :D!!!

 

Well a TA worker told me that there are enough R160s to replace all the R32,R38,R40 slant,R40M and R42. The R160 contract will be over til December of 2009.

Link to comment
Share on other sites

We have a bunch of R38s laid up that are scheduled for reef project this week. As soon as I see them pulled into the shop and a cutting torch being taken to them. I will post some pics. We have a large number of R32s from Jamaica that are being cut up right now... I guess it depends on how long it takes to finish those.

 

As for the R42s on the C. There has been a few here and there that I saw... I dont know if there is a set schedule to send these to the C line but ill try and keep everyone posted.

Any possibility of taking some stuff off the R38 for me before they are scrapped?

Link to comment
Share on other sites

 

Due to different placement of C/R cabs in the R40Ms/R42s than R32s/R38s, new conductor boards have to be installed along the (C) line.

 

 

New 8-Car, R42 Indicator Boards have already been installed along the entire A line for close to three weeks now. The are similiar to the ones installed along the J/M/Z and L lines. The R42 markings have been on the platform/station walls for over two months now.

Link to comment
Share on other sites