Jump to content
Attention: In order to reply to messages, create topics, have access to other features of the community you must sign up for an account.

The New South Ferry Station will be complete in Decmber (2008).Updated images.


Kexpress

Recommended Posts

I THINK, SFT is getting platform screen doors. The scaffolding above the edge of the platform looks like the preparation for the doors.

 

Ugh, I hope they don't that just destroys my railfanning pictures! :mad:

Link to comment
Share on other sites

The new signals are up and running, so now the (1) for now gets a bottom yellow, for the old loop south of Rector S/B, and another bottom yellow south of Rector N/B. I was on that line yesterday, and the wood walls are now torn down. The punch box is also up and running. Money has been put back on the (1), so the oldies are coming back, bumping other oldies already there. A break at each end, no more round and round...........

Link to comment
Share on other sites

The new signals are up and running, so now the (1) for now gets a bottom yellow, for the old loop south of Rector S/B, and another bottom yellow south of Rector N/B. I was on that line yesterday, and the wood walls are now torn down. The punch box is also up and running. Money has been put back on the (1), so the oldies are coming back, bumping other oldies already there. A break at each end, no more round and round...........

 

Sounds like it'll be nice for train crews having a (E) chambers style station to chill for a few minutes.

 

- A

Link to comment
Share on other sites

Sounds like it'll be nice for train crews having a (E) chambers style station to chill for a few minutes.

 

- A

 

Yes, so the (6) will be the line us A Div rookies will see alot of. They usually kept rookies on the (1) and (6), but the (1) is now a contender with the big boys once again. Guess I better get my ears tuned for the R142A, and that propulsion, for nearly 2 hrs, on 3 trips. I am going to hear it in my sleep, and when I wake up...........

Link to comment
Share on other sites

The new signals are up and running, so now the (1) for now gets a bottom yellow, for the old loop south of Rector S/B, and another bottom yellow south of Rector N/B. I was on that line yesterday, and the wood walls are now torn down. The punch box is also up and running. Money has been put back on the (1), so the oldies are coming back, bumping other oldies already there. A break at each end, no more round and round...........

 

Wow, I need to go down there sometime.

Link to comment
Share on other sites

Ugh, I hope they don't that just destroys my railfanning pictures! :mad:

 

I doubt they would. They would prevent you from falling off!

If those doors are going to be installed at the station, I hope they are not jacked up like the CBTC and be another epic technological fail. :)

Link to comment
Share on other sites

They won't you will still able to take pictures/record even if it has screen doors.

 

I know, what I mean is you can't clearly see the train in the station with those doors, but I am sure it's not happening. You know the (MTA) hasn't gotten that far yet.

Link to comment
Share on other sites

I know, what I mean is you can't clearly see the train in the station with those doors, but I am sure it's not happening. You know the (MTA) hasn't gotten that far yet.

 

I THINK they are. I've seen platform screen door installation myself when I was riding the subway line 1 in Guangzhou, China. They were busy installing PSDs at some stations. The PSD installation is the same in Hong Kong. Based on these pictures, it does seem that they are installing the doors.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.