Just curious if anyone has an update as to where the East Side Access project is these days. What progress has been made? What are the big milestones still left to complete? Just curious for any info. Thanks!

Share this post


Link to post
Share on other sites

It shouldn't be too difficult. A set of flyovers or under's connecting inbetween the mainline local and express before they start to descend to the current tunnel and planned Skillman Ave station. There's a lot of "unused" space in that yard.

Edited by Tbirdbassist

Share this post


Link to post
Share on other sites
It shouldn't be too difficult. A set of flyovers or under's connecting inbetween the mainline local and express before they start to descend to the current tunnel. There's a lot of "unused" space in that yard.

 

Aren't a few buildings being knocked down as well?

 

(in Sunnyside, that is)

Share this post


Link to post
Share on other sites

I'm looking at the yard via Gmaps right now and I think a crossunder would be an unnecessary challenge, the Amtrak storage tracks and some MOW (I assume) buildings are right in the way.

 

So using logic, I'm guessing they'll swing the tracks over the Amtrak storage, bring them up and back down before the Honeywell St bridge.

 

According to the ESA wiki the new station will be at Queens Blvd and Skillman, so it won't have access to Grand Central, since the new portal is north of there.

Share this post


Link to post
Share on other sites
According to the ESA wiki the new station will be at Queens Blvd and Skillman, so it won't have access to Grand Central, since the new portal is north of there.

 

The whole point of ESA is to allow the LIRR to access Grand Central, and the wiki says that it would be one stop from the new station into Manhattan... don't know what you're getting at.

Share this post


Link to post
Share on other sites
The whole point of ESA is to allow the LIRR to access Grand Central, and the wiki says that it would be one stop from the new station into Manhattan... don't know what you're getting at.

 

Here's a quote from the wiki article (you did read it, didn't you?):

 

A new LIRR train station in Sunnyside at Queens Boulevard and Skillman Avenue[1] along the LIRR’s Main Line (into Penn Station) will provide one-stop access for area residents to Midtown Manhattan.

 

The three key words being: "into Penn Station".

Share this post


Link to post
Share on other sites
The whole point of ESA is to allow the LIRR to access Grand Central, and the wiki says that it would be one stop from the new station into Manhattan... don't know what you're getting at.

 

 

Reading comprehension my friend, gain it. Re read what I wrote a bit more carefully.

Share this post


Link to post
Share on other sites

Yea, they will modify 100+ year old track alignments to do this, i hope they do it right.

 

- A

Share this post


Link to post
Share on other sites
Here's a quote from the wiki article (you did read it, didn't you?):The three key words being: "into Penn Station".

 

Reading comprehension my friend, gain it. Re read what I wrote a bit more carefully.

 

Reading comprehension fail on my part. At least you guys let me off kindly, unlike some other people on this forum.

Share this post


Link to post
Share on other sites

Haha, I find it ironic that they're planning on opening up a new station along the main line, especially after giving up on the stations along the Long Island City branch. Although you can't blame the numbers - it would have cost them too much to renovate the stations for the incoming C3 bi-levels, but I stand by the opinion that the reasons these stations failed so hard is because they weren't kept up at all. I remember riding out to Glendale ONE time, and it was a totally different experience from riding the EMUs on the main line, or the C3s for that matter. The station was barely more than cracked ground-level platforms. I wonder if the new station, given it's projected location, might have some form of physical walkway to Queensboro Plaza or something.

 

Does anyone know if when ESA is completed, if it will pull current trains from Penn at all? I gather the M9 order will pretty much cover additional trains to Grand Central, but it will be interesting to see.

 

It's going to be such a change when ESA is completed. I guess no more switching to the (7)<7> at Woodside for those of us trying to get to GCT.

Share this post


Link to post
Share on other sites

ESA isn't about creating more slots in NYP, it's an addition of service.

 

Following ESA, the Ronkonkoma Branch needs to be double tracked.

Share this post


Link to post
Share on other sites

This is what I think ESA should eventually push the MTA to do, in order of importance:

 

Triple-track Mainline to Hicksville

Double-track to Ronkonkoma

Electrify Central Branch (Bethpage-Babylon)

Double-track to Port Jefferson

Electrify to Port Jefferson (this would avoid the need for a Huntington Yard)

Electrify to Sayville/Patchouge

 

 

As for the MTA's plan to electrify to Yaphank and a build yard there, I feel it's a waste of money.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.