Jump to content

More Brighton Line Rehabilitation?


UlmerPark B6

Recommended Posts

My street, Avenue J, has one lane closed now, just like in Avenue U, and constructions signs has been posted all along the street, so this might be a long-term project.

004-22.jpg

See the construction thing in the back, there's also a blue, tiny bulldozer, the one at Avenue U, but don't think you can see it in the pic, sorry for the quality.

Link to comment
Share on other sites


55 is the maximum operating speed, isn't it?

 

Yeah, but Ulmer told me he saw an R160 hit 56 one time between Kings Hwy and Sheepshead Bay. I doubt he was lying. And thats with distance lost because of the track switch. I can imagine R160's hitting in the low 60's between Kingshighway and newkirk. Hopefully one day the Brighton Express will have R160's running full time.

Link to comment
Share on other sites

Yeah, but Ulmer told me he saw an R160 hit 56 one time between Kings Hwy and Sheepshead Bay. I doubt he was lying. And thats with distance lost because of the track switch. I can imagine R160's hitting in the low 60's between Kingshighway and newkirk. Hopefully one day the Brighton Express will have R160's running full time.

Yeah, certain trains can exceed 55. But I'm not sure if the max speed for one particular stretch of track would be increased to say 60.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.