R211 10001
-
Posts
13 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Downloads
Events
Blogs
Posts posted by R211 10001
-
-
Next:
A stupid train conductor trying to beat a train on the southbound tracks accidentally derailed at the Canal Street interlocking, so both southbound tracks of Canal Street are closed. Also, service on the Queens Boulevard line is suspended between 50 Street and Queens Plaza for platform door installation. (And take into account that 57 St- 7 Avenue is still closed.)
0 -
I thought CBTC will go everywhere eventually soon. Aren't the R160s on the , , , and gonna be CBTC compatible? I would also like to include the other NTT fleets (R142/142A).
Just the and , and I think the .
0 -
Next, Grand Central Station is out of service due to a bombing. How do you reroute traffic?
0 -
57 Street-Seventh Avenue is closed in both directions because of a police investigation. How would you reroute service?
0 -
Put them on the and give the R160s from the to the .
Or, install CBTC on the R160s.
0
Subway - What If?
in New York City Subway
Posted
I meant what I said.
ATO is also shut down throughout the entire IND, so there's only 20 tph in all IND tunnels, that includes the Manhattan Bridge.