I think that Phase 2 can be completed by 2025 if Albany and City Hall get their act together, i can hope right???
Phase 2 stations were built in the the many tries before, when this incarnation of the plan was discussed they pointed out that the old structures can be used, so if we dont get it built, shame!!!
While we are building Phase 2, we can also start building Phase 3 as they do not touch each other. Like always the question is funding. That is probably done by 2030.
1 -
How would a QBL CBTC work, 8th Ave, 6th Ave and Crosstown line are not CBTC. Would you have it CBTC on that corridor then two operator operating in Manhattan and Brooklyn. Wouldnt that defeat the whole purpose?? After Flushing line and Carnarsi line, only the shuttle line can go to CBTC without forcing the rest of the system to also be CBTC.
0 -
What happened to the R143s? Thats a huge drop.
0 -
Why does the WTC Path station have 3 platforms(1 unused)? And why does the WTC-NWK use only one track while WTC-HOB used two tracks??
0 -
So the local 7 train can not be converted to an express 7 train when using R188s, or visa vera? The R62s were able to be converted back and fourth. Will this create a problem?
0
Second Avenue Subway Discussion
in New York City Subway
Posted
No third track: http://secondavenuesagas.com/2008/06/25/rising-costs-shelve-third-second-ave-subway-track-at-72nd/