  1. quote from the Path website

    "The Signal System Replacement program is a key component to the modernization of PATH. This integrated program will ensure the long-term viability of PATH by bringing it into the 21st Century using the latest technology and continuing to provide customers with reliable and safe service. This new signal system will allow PATH trains to safely run closer together, increasing the number of trains we can fit on the system during peak times. Over the past few years, the Board authorized projects for the replacement of the entire PATH Signal System with a modern Automatic Train Control System (ATC) using communications-based train control technology. PATH staff is diligently working with the Signal Contractor and has currently completed Final Design Reviews. This project is scheduled for completion in 2015"

     

    I didn't know they were doing ATC.

    They started looking into it when the Lackawanna tracks were changed to allow that NJ Transit division access to Penn Station. So much trackage was ripped up and replaced that area in the Harrison- Secuscus yards don't look anything as it did 20 years ago. Right now only a very small portion of the system engages with regular rail at this time and when they remove and replace that the system can use atc fully.

  2. I was musing on that in regards to NTTs and Jamaica Yard. The current forecast calls for the portion of the Queens Blvd CBTC project to Union Tpke to last between late 2014 and 2018. The thing is that there is no mention of R160's being retrofitted for CBTC in their most recent 20 years assessment  and was never brought up in any of the committee meetings published to this date. Even as we know that is definitely feasible as were done with many of the 4 car sets assigned to ENY.

     

    This raises many questions as to what the MTA may do with the R211 order for 752 cars to replace the R46/46s. Even as the installation according to the contract may end in 2018, it may in reality take even longer then that to achieve going from how long it took for installation on the BMT Canarsie line.  I believe it was 7 years from the year 2000 to around 2007 when it was finally operational.

     

    It has to do with cost analysis and available funds. Remember the funds are dependent on the economy and all of this is being done with surplus money so to speak. Its like the latest derailment in Queens where money had to be found and 500 feet of track replaced and damaged cars. This probably set back all new work by 2 months. So to have a fixed date is nice but all of this is tentative. Its like the 7 line station at 34/11th ave which was to open in 2013 but the elevators designed by the Italians don't work for the handicapped so this is being pushed off into the future.

  3. That's a Fairbanks Morse engine. Still being built since 1938. Same engine, same reliability for submarines, ships, and even locomotives.

     

     

    FM/ALCO 251 F engine

    111.jpg

    It didn't work that well in locomotives or Fairbanks would of been a major player after WW2.  In stationary design it can't be beat but variable throttle they don't hold up.

×
×