Jump to content

vngannxx

Veteran Member
  • Posts

    7
  • Joined

  • Last visited

Posts posted by vngannxx

  1. Building a cross platform transfer at grand st with 2nd/6th Ave crossovers and rerouting the route south of Chatham square to merge with the JZ at Chambers St would present additional operational flexibility.

    - it would allow B/D trains coming from 6th ave to access Montague. 

    - allow the T to bypass the midtown portions of 2nd ave due to construction/stall train, travel via 6th ave to lex 63st, where it can continue from 72-125st. 

    - provide the T with transfer options at Fulton st. 

  2. How about instead of phase 2, we make a connection between the 8th Ave express tracks and the 63 st tunnel. C and E train 8th Ave local to WTC. K train (Fulton St local and 8th Ave Express) to 96 st via the Q.

     

    K train stops at

    42 st PABT

    Lex 63 st

    72st

    86st

    96st

  3. I don't have a problem with a (V) train running from 96th and 2nd to the Culver Line express tracks, as long as there is enough track/signal capacity for it. Perhaps when CBTC comes to the 6th Ave Local tracks, then it might be possible to have it.

     

    I do have a problem with putting the (M) back on the Nassau St Line, where it is not needed.

     

    The plan might work if SAS phase 3. 

    Run Culver express trains via rutgers to 2nd ave phase 3 to pair with the T.

    Keep the M on the 6th ave line.

     

    Maybe have the T use the nassau line to save costs and run it via montague to brooklyn.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.