Jump to content

Far rockaway

Veteran Member
  • Posts

    422
  • Joined

  • Last visited

Posts posted by Far rockaway

  1. I hope the MTA can make phase 2 happen or start construction of it before 2020. That seems like a long time to start construction of that phase. It seems in my perspective phase 2 doesn't need that much work  done and you already have an existing tunnel that was built in the 1970's and i know some of that tunnel has to be rebuilt but it shouldn't take long to rebuilt that part of the tunnel.

     

    And I think an 125 street crosstown subway would be a good idea and i think that should be part of phase 2 also if possible and if not it be part of phase 3 if the MTA can't build a fully second ave subway. I would also like to see phase 2 complete before 2020.

     

    This is my first time seeing a subway being built. Just my thought on the second avenue subway.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.