  1. On 1/15/2019 at 2:41 PM, Daniel The Cool said:

    Looks like the (Q) Train will run in two sections

     

    ELECTRICAL IMPROVEMENTS
    11:30 PM Fri, Feb 8 to 5 AM Mon, Feb 11
    (D) Service between 59 St in Manhattan and Atlantic Av-Barclays Ctr in Brooklyn is replaced by (F)(Q) trains and free shuttle buses   


    Days/Evenings:
    (D) trains run between 205 St and 145 St and via the (C) local to/from W 4 St and via the (F) to/from 2 Av, the last stop. (Some (D) trains will run to/from Canal St during peak times)    
    (Q) trains replace the (D) in Brooklyn between Atlantic Av-Barclays Ctr and Stillwell Av.  

    Overnights:
    (D) trains run between 205 St and 59 St-Columbus Circle and via the (C) local to/from W 4 St and via the (F) to/from 2 Av, the last stop.   
    (Q) trains replace the (D) in Brooklyn running local between DeKalb Av and Stillwell Av.   

    Transfer between (D) and (Q) trains at Times Sq-42 St/Port Authority.  
    Transfer between (F) and (Q) trains at 34 St-Herald Sq.  

    Also (C) trains running express in both directions between 145th st and Canal St

    (D) trains will provide local service along the (C) line in both directions between 145th st and Canal St.

  2. 5 minutes ago, trainfan22 said:

    Why couldn't LIRR cross honor to at least Flushing Main Street?

     

    Lol @ cross honor for stations BETWEEN Penn and Woodside, there is no stations between Penn and Woodside on LIRR!

    whoops typo error. I meant between Woodside station and Penn station.I don't think it's necessary to extend the cross honor to Flushing Main Street because the (7) train is still running to main street. If it wasn't running around there then maybe they would extend the cross honor to Flushing-Main st. For that to happen, it would probably require the whole (7) line to be completely suspended for one weekend.

  3. Big weekend G.O. 1/26-1/27

    No (7) trains between 74th st-broadway and 34th st-hudson yards

    (7) trains run between main st and 74th st-broadway

    Free shuttle buses operate in three sections:

    1.Between 74th st-broadway and Queensboro Plaza

    2.Between Queensboro Plaza and Vernon Blvd-Jackson ave

    3.Between Times sq-42nd st and 34th st-hudson yards

    For service between queens and manhattan take the (E)(F)(N), or (R) trains

    Additional (E) service runs days and evenings between queens and manhattan

    LIRR will cross honor metrocards for stations between woodside(queens) and penn station(manhattan)

    (S)42nd street shuttle service will run overnight

     

  4. 18 minutes ago, Lawrence St said:

    Oh then that changes it. But on a normal weekend the (C) should never run.

    However, I do have an idea. Why doesn't the (F) run via Crosstown, the (E) via 63rd and 6th down to West 4th then normal route and the (C) via the (F) from West 4th to Hoyt?

    Not a bad idea, but the thing is, all those (F) train passengers from 179th st cramming the (E) with existing passengers already on that train would be a problem.

    But in theory this would be another way of a reroute change.

  5. 11:45PM Fri to 5AM Mon Dec 14-17

    (F) trains run via the (E) between Roosevelt av And 5av/53rd st in both directions then resume regular service at 47-50th st 

    (R) trains run via the (F) between 36th st and Lexington av 63rd st in both directions then resume regular service at 57th st-7th av

    (N) trains provide alternate service to Lexington av 59th st and 5thav-59th st

     

     

     

  6. Overnight Work

    9:45PM to 5AM Dec 17-21 Mon to Fri

    9:45PM to 5AM Dec 26-28 Wed to Fri

    No (J) and (Z) trains between 121st and Jamaica Center. Free shuttle buses and (E) trains provide alternate service between 121st and Jamaica Center.

     

    Weekend/Weekday Work

    9:45PM Dec 28 to 5AM Mon Jan 7

    No (J) and (Z) trains between 121st and Jamaica Center. Free shuttle buses and (E) trains provide alternate service between 121st and Jamaica Center.

  7. 2 hours ago, Train92 said:

    " (M)buses make all stops between Metropolitan Av and Myrtle Av (Broadway) and run express to/from Delancey St/Essex St in Manhattan."

     

    This is a direct quote from the MTA website, but eariler today when i took said bus, it stopped at all stations until Myrtle Avenue. Serious miscommunication here 🙄

    yes series miscommunication. I know i thought the shuttle buses would run express between myrtle ave and essex street.

  8. 47 minutes ago, Lawrence St said:

    Wait, if the (J) isnt out between Myrtle Av and Broadway Junction, then why is the (M) suspended?

    Because of track replacement between metropolitan ave and myrtle ave. J trains are running normal service to Manhattan. 

    (M) trains will be suspended every weekend from Dec 8 to the last weekend of January because of track replacement and also other critical work that has to be done to prepare for the (L) train shutdown in april. The MTA released a press release on weekend work on the (J) and (M) that is related to the (L) train shutdown.

  9. Planned service changes for December as of now:

    (A):Brooklyn bound trains run via the (F) from W4 st to jay st-metrotech. 12/1-12/2

    (C):Brooklyn bound trains run via the (F) from W4 st to jay st-metrotech. 12/1-12/2

    (E):No trains between briarwood and jamaica center. 12/8-12/9, 12/15-12/16. 

          Trains rerouted to 179th st

    (F):No trains between church ave and stillwell ave. 12/1-12/2, 12/8-12/9, 12/15-12/16       

          Jamaica 179th st bound trains run via the (E) from 47th-50th st to roosevelt ave 12/1-12/2, 12/8-12/9, 12/15-12/16

    (G):No trains between court sq and nassau ave. 12/1-12/2, 12/8-12/9 

          No trains between court sq and bedford nostrand ave 12/15-12/16, 12/22-12/23 

    (J):No trains between hewes street and broad street 12/1-12/2, 12/8-12/9 

    (M): trains suspended 12/8-12/9, 12/15-12/16, 12/22-12/23, 12/29-12/30 

    (N):No trains between Queensboro plaza and Ditmars blvd 12/1-12/2, 12/8-12/9

    (Q):Brooklyn bound trains run via the (R) from canal st to dekalb ave

    (R):Bay ridge bound trains run via the (F) from 36th st to Lex-ave 63rd st then resume regular service 12/1-12/2, 12/8-12/9

         Bay ridge bound trains run express from canal st to 36th st 12/1-12/2

    (S): Shuttle trains suspended in brooklyn. 12/1-12/2, 12/8-12/9

    You can add on to the list

          

     

     

  10. 36 minutes ago, darkstar8983 said:

    NYC is not ready for the (L) shutdown, nor will they ever be. There are too many construction projects getting done in the city to try to streamline traffic that is making it a nightmare to get around both in a car and on the subway. I think a re-evaluation of the shutdown should be done, to either cancel the shutdown (restricting work to overnights and weekends), or finding another way to do the reconstruction:

     

    A diamond crossover should have been proposed east of 1 Av to allow the (L) to operate 7.5-minute headway’s into Manhattan (8 tph would be a lot better than 0). Then one tube would be reconstructed at a time. The (L) would run reduced service, but normal service between 8 Av and Canarsie. 

     

    the extra subway service proposed would still be provided, and the shuttle buses would not be needed. 

     

    Customers east of Myrtle Av would still be encouraged to take the (J)(M) trains. And those past Broadway Junction would be encouraged to take the (A)(C)

    Even at reduced capacity, the (L) is needed.

    Yeah I think NYC is also not ready for the (L) shutdown but this is already planned out and finalized already. The MTA really can't cancel the shutdown at this point. New Yorkers would really have to deal with this either way. I know the first few weeks of the shutdown it is going to be crazy but i think after that point, it should be okay for people after adjusting to using alternative service routes for the first couple of weeks to get to their destination.

  11. Coney Island bound (F) trains run express from smith 9thst to kings hwy 9:45AM to 3:30PM Oct 22-26

    (N) trains replace the (W) between 57th st-7 ave and ditmars blvd 10AM to 3:30PM Oct 22-26

    (W) trains run via the (Q) between 57th st-7 ave and 96th st 10AM to 3:30PM Oct 22-26

    (W) trains run every 20 minutes in Manhattan

  12. On 9/26/2018 at 10:28 AM, S78 via Hylan said:

    For next month:

    (2) Wakefield-bound service runs express from 3 Av-149 St to E 180 St; Split (5) service: Oct 6-7

    (3)(4) No service East of Utica Av: Oct 13-14

    (4) Reduced service North of 125 St: Oct 13-14, 20-21

    (4) No service South of Brooklyn Bridge; Local service in Manhattan: Oct 19-22 (Begins 9:45 PM Friday evening)

    (5) Reduced service in Manhattan: Oct 6-7

    (5) No service south of Grand Central: Oct 20-21

    (7) No service West of Queensboro Plaza: Oct 6-8, 13-14*, 20-22, 27-29  *Ends at 10PM Sunday evening

    (S) 42 Street operates overnight: Oct 6-8, 13-14, 20-22, 27-29

    (A) No service between Rockaway and Lefferts Boulevards: Oct 13-14

    (A)(C) Uptown trains run express along CPW: Oct 6-8

    (F) Jamaica bound service runs via 53 St: Oct 6-8, 13-15, 20-22

    (J) No service East of Crescent St: Oct 6-7, 13-14, 20-21

    (L) No service between 8 Av and Broadway Junction: Oct 6-8, 13-15, 20-22, 27-29

    (M) Operates to 96 St to supplement the (L) and (Q)  : Oct 6-8, 13-15, 20-22, 27-29

    (Q) No service between 96 St and Prospect Park: Oct 5-8, 12-15, 19-22 (Note: These changes begin 9:30 PM each Friday evening)

    (R) No service south of 36 St, Brooklyn; No late night service: Oct 12-15, 19-22

    (W) Operates to supplement the (7) : Oct 6-7, 13-14, 20-21, 27-28

     

    There's sure to be more changes popping up as we get into October, so if any extras appear, please add them.

     

    Coney Island Bound (F) trains run via 53rd st Oct 27-28,

    No (J) train service east of crescent street Oct 27-28

    No(N) train service between 59thst and Stillwell ave. (N)trains run via the (D) line between 36st and stillwell ave Oct 27-28

    Free shuttle buses provide alternate service between 59th st and stillwell ave

  13. They could've just ran the (Q) in two sections

    1. Between Stillwell ave and prospect park as a shuttle

    2.Between Stillwell ave and 96th st 2nd ave via the (D) line and (F) line to Lextington ave 63rd st then resume normal service via 2nd ave

    Or would it be too much trains on 6th ave

    They could of done this instead of suspending it in manhattan.

  14. Update to the list

    Weekend of Sep 29-30

    No (2) trains between Franklin ave and Flatbush ave 

    (4) trains operate in two sections

    Between Woodlawn and 125st

    Between 125st and Utica Av

    No (5) trains between 149thst grand concourse and Dyre ave

    (2) trains provide alternate service between 149thst grand concourse and E180th st

    (D) trains operate via 8th ave and culver

    No service between kings hwy and stillwell ave

    (F) trains operate via Broadway and west end

    No (J) trains between crescent st and Jamaica center 

    (M) trains extended to Chambers st (J) station

     

     

  15. Here are the planned service changes so far for the month of September

    (1) 9/1-9/3, 9/15-9/16- No trains between 14thst/rector st and south ferry

    (2) 9/1-9/2- No trains between 135th st and E180th st

    (3) 9/8-9/9, 9/15-9/16- No trains between 96th st and 148th st

    (4) 9/8-9/9- No trains between bowling green and Utica Av

    (5) 9/1-9/2, 9/15-9/16, 9/22-9/23- No trains between 149th st Grand Concourse and E180th st. (2) trains provide alternative service

          9/8-9/9-No trains between E180th st and Dyre av

    (D) 9/15-9/16, 9/22-9/23- Runs via 8th ave and Culver. Note: No trains between kings hwy and stillwell ave.

    (C) 9/15-9/16-No trains between 145th st and 168th st

    (E) 9/1-9/3- No trains between queens plaza and world trade center.Runs via 63rd and 6th ave to 2nd ave- the last stop

    (F) 9/15-9/16, 9/22-9/23- Runs via broadway and west end

    (G) 9/8-9/9- No trains between Court Sq and Bedford-Nostrand ave

         9/15-9/16, 9/22-9/23- No trains between Court Sq and Nassau ave

    (J) 9/1-9/2, 9/8-9/9- No trains between Hewes street and Broad St

          9/15-9/16, 9/22-9/23- No trains between Crescent St and Jamaica Center

    (M) 9/15-9/16, 9/22-9/23- Trains extended to the Chambers St (J) station. Trains operate every 20 minutes

    (N) 9/1-9/3, 9/8-9/9- Runs via west end in both directions. Note: Only Coney island bound trains runs via west end on the weekend of the 9/1-9/3

          9/8-9/9, 9/15-9/16, 9/22-9/23- No trains between Queensboro Plaza and Ditmars Blvd

          

×
×