Jump to content

LGA Link N Train

Veteran Member
  • Posts

    2,696
  • Joined

  • Last visited

Everything posted by LGA Link N Train

  1. What I'm thinking is that the 4 car R179's should be CBTC retrofitted and placed on the and lines. I'm not sure if the should get any R179's. As for the R179 5 car sets, ALL OF THEM should run on the line, putting some R46's on the just to lengthen the trains along it's route. As for the remaining R32's (which in my opinion should be about 140 left, don't know for sure) they should run as 10 car trains on the and the should run up to at least Ozone Park or Rockaway park for A/C purposes. As for the R32's on the and lines, they should remain the same with a few upgrades on the interior's. R211's in this case, should ALL BE 5 car sets and only 5 car sets to allow flexible service and full length trains on the and lines. Though trains will most likely still be using R68's during this time.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.