Jump to content

Question about the R143


R44 CNG

Recommended Posts


No. The R143 has run only on the (L). The R143 is designed for CBTC which only the (L) has installed. Would be pointless and a waste of money to run them on non-CBTC lines.

 

The R143s were tested on the Flats out by the Rockaways and the express tracks on the (F) between 4th Av and Church Av did have CBTC equipment installed for testing only. It has since been removed.

Link to comment
Share on other sites

No. The R143 has run only on the (L) and for a short period of time on the (M2) weekend shuttle which was then replaced by the R160s. The R143 is designed for CBTC which only the (L) has installed.

 

The R143s were tested on the Flats out by the Rockaways and the express tracks on the (F) between 4th Av and Church Av did have CBTC equipment installed for testing only. It has since been removed.

 

Thank You!:tup:

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.