Jump to content

Attention: In order to reply to messages, create topics, have access to other features of the community you must sign up for an account.
Sign in to follow this  
MTR Admiralty

Station Rehab Projects (Construction Photos + Renderings)

Recommended Posts

Will the Bleecker St. rehab involve abandoning part of the existing platform?

 

it's very possible, but i can tell you this. when they have G.Os for it, it's HELL on da lex. (downtown (6) running express from union to bklyn bridge?)

Share this post


Link to post
Share on other sites

Very nice, should be fun taking pics from the abandon platform if they don't turn it into crew rooms or something.

Share this post


Link to post
Share on other sites
Very nice, should be fun taking pics from the abandon platform if they don't turn it into crew rooms or something.

 

talkin about abandoned portions of existing platforms, i remember riding Willy thru rector street southbound, just before the actual station. i saw a closed portion of the platform and it was WELL LIGHTED! it was only seperated from the active section by a false wall.

 

and about the pictures, cortlandt looks like its ok for reopening. there are talks about opening the NB plat soon, while leavin the SB. i wood say perhaps open both of them up, however, access to street is via the crossunder they built.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  


×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.