  1. Wonder why they are extending the to Chambers St?
  2. Service Change Posted: 10/18/2014 4:04PM Due to track maintenance at DeKalb Av, the following service changes are in effect: , , and trains are running with delays in both directions. Some southbound trains terminate at Canal St. Some northbound trains are terminating at 57 St-7 Av. Some southbound trains terminate at Whitehall St-South Ferry. Allow additional travel time. This comes at the bad time when the is shutdown in Manhattan. Maybe they should had saved that when the is running normal. I'm assuming it could be a signal problem or mechanical problems. Why you do really want to know about this?
  3. Due to signal problems at Wall St, southbound and trains are running with delays. Some southbound trains are running on the line from 149 St-Grand Concourse to Nevins St. Allow additional travel time. Due to signal problems at Euclid Av, northbound trains are running with delays. Allow additional travel time. Due to signal problems at 4 Av, southbound and trains are running with delays. Allow additional travel time. Due to signal problems at Hewes St, Broad St-bound trains are running express from Myrtle Av to Marcy Av. Allow additional travel time. Due to signal problems at 8 St-NYU, southbound and trains are running with delays. Allow additional travel time. Must be a busy day for those signal maintainers.
  4. Due to a rail condition at Borough Hall, the following service changes are in effect: No train service between Nevins St and Wall St. No train service between Crown Heights-Utica Av and Wall St. Northbound trains are running on the line from Nevins St to 149 St-Grand Concourse. Northbound trains terminate at Crown Heights-Utica Av. Southbound trains terminate at Chambers St or Wall St. Some southbound trains terminate at Chambers St or Wall St. Allow additional travel time. What a day for the IRT Eastern Parkway Line!!! Rail conditions are the issue.
  5. The rail condition at Atlantic Ave-Barclays is still ongoing. Maybe do a emergency GO with the shortturning at Bowling Green late night and extend the just for 1 night. So workers can fix the rails without interruption
  6. Still ongoing: Service Change Posted: 10/10/2014 12:09PM Due to a rail condition at Atlantic Av-Barclays Ctr, some southbound and trains are terminating at Brooklyn Bridge-City or Bowling Green. Allow additional travel time. Good thing the is back in service.
  7. It was supposed to be Lex Ave/53rd street.
  8. Service Change Posted: 09/26/2014 9:59PM Due to a train with mechanical problems at Bowling Green, the following service changes are in effect: Some northbound trains are running on the line from Nevins St to 149 St-Grand Concourse. Some southbound and trains are terminating at Brooklyn Bridge-City Hall. Allow additional travel time.
  9. So far the new equipment at the tube is handling well with the and the . No service outage so far all weekend.
  10. Due to mechanical problems with the South Channel Bridge, the following service changes are in effect: train service is suspended between Broad Channel and Far Rockaway-Mott Av. Rockaway Park service is also suspended between Broad Channel and Rockaway Park -Beach 116 St. As an alternative customer can take the Q52, Q53 and Q22 for servicec between Broad Channel and Far Rockaway-Mott Av. Allow additional travel time.
  11. Maybe it due to Manhattan Bridge inspection. They haven't yet done it since the tunnel shut down
  12. Trains run via the in both directions between Atlantic Av-Barclays Ctr and Canal St Weekend, 12:01 AM Sat to 5 AM Mon, Sep 20 - 22 Trains stop at DeKalb Av, Jay St-MetroTech, Court, Whitehall, Rector, Cortlandt Sts and City Hall. • Please allow additional travel time. Trains run via the in both directions between DeKalb Av and Canal St Weekend, 12:01 AM Sat to 5 AM Mon, Sep 20 - 22 Trains stop at Jay St-MetroTech, Court, Whitehall, Rector, Cortlandt Sts and City Hall. • Please allow additional travel time. ______________________________ This will be interesting to see if the new equipment in the tubes will be ready for more frequent headways. Hopefully it will not screw up.
  13. Due to track maintenance at Kew Gardens-Union Tpke, the following service changes are in effect: Some northbound trains terminate at Queens Plaza. Some northbound trains terminate at 21 St-Queensbridge. and trains are running with delays in both directions. Allow additional travel time AGAIN?! Why they can't just save it for late night work?
  14. Due to signal problems at Queensboro Plaza, the following service changes are in effect: There is no train service between 74 St-Broadway and Times Square-42 St in both directions. There is no train service between 57 St-7 Av and Astoria-Ditmars Blvd on both directions. Allow additional travel time. Hopefully this will get resolved soon. Possibility sending shuttle buses if this lags on for hours. Usually when the signal problems at Queensboro either the 7 or the N would get shutdown but never both at the same time.
  15. Suspended Posted: 08/16/2014 1:15PM There is a suspension of train service. There is no train service from 8 Av to Canarsie- Rockaway Pkwy in both directions due to a signal problem. Customers may use the M14 making corresponding stops from 1 Av to 8 Av. For service into Manhattan please use the , or train service. Allow additional travel time.
  16. Due to track maintenance at Flushing-Main St, the following service changes are in effect: trains are running with delays in both directions. Main St bound trains terminate at Mets-Willets Point. As an alternative customers are advised to use Q48 bus service. Allow additional travel time. Great what a mess!!
  17. still running local in both directions. Wonder what was the cause of this? This reminds me of the 2005 Chambers St fire anybody remember this?
  18. Due to service being via local as a result of track maintenance between 5 Av-53 St and Briarwood-Van Wyck Blvd, the following lines are running with delays: and trains in both directions. Northbound and trains. Allow additional travel time. The 53rd st tube is closed all weekend and I don't get why they doing track maintenance causing delays since the express tracks are "closed" for the weekend.
  19. No. They just allow people in the trains without checking tickets.
  20. Delays Posted: 12/10/2013 7:36PM Due to signal problems between 33 St-Rawson and 61 St-Woodside, there is very limited train service with substantial delays between Times Square-42 St and Flushing-Main St. Customers are advised to take , , , , or trains making nearby station stops. LIRR is cross-honoring fares at 34 St-Penn Station, 61 St-Woodside and Flushing-Main Street. Allow additional travel time. Still ongoing problems
  21. A big mess on the Service Change Posted: 12/10/2013 5:30PM Due to signal problems between 33 St-Rawson and 61 St-Woodside: Both directions, no train service between 74 St-Broadway and Times Square-42 St. Customers are advised to take , , and trains making nearby station stops. Allow additional travel time. Hopefully they will fix it soon as possible. Bad timing for the PM rush. I bet the Q32/60/66 is packed. I'm wondering why they couldn't do a shuttle between Queensboro and Times Square?
  22. The ran express in both directions between 42nd street to 125th street due to police investigation at 59th st. I was caught in that mess. After visiting Whitney museum went down to the 77th street station and the metrocard readers stated "no entry" and there were a line for the M101/M102/M103 buses. Bus was packed bypassed my stop. Had to walk all the way to Lex Ave/63rd street to catch the . It was a mess. I found out that there was a guy struck by the between 59th and 51st street on the news. Possible suicide attempt. He was transported to the hospital in critical condition. Gee thanks a lot to that guy it took me 1 1/2 hours to get home. He should had not done that. Instead he should had gone to an hospital for treatment not jumping on the tracks and get nearly killed.
  23. Delays Posted: 07/09/2013 3:59PM Due to signal problems at Court St, northbound trains are running with delays. Allow additional travel time. They should start the repairs NOW!
  24. Service Change Posted: 07/08/2013 7:13PM Due to police investigation at 50 St, the following service changes are in effect: Northbound local from Canal St to 59 St. Northbound trains are running on the line from W4 St to 5 Av-53 St. Allow additional travel time. The 8th avenue line is getting socked with problems today!
×
×