Jump to content

2 Train Master

Veteran Member
  • Posts

    2,064
  • Joined

  • Last visited

Posts posted by 2 Train Master

  1. It doesn't matter if people are critizing,nitpicking or whatever about something they're or WE are trying to point something out to the developer(s).If I was critized about something I would take it as a compliment no matter how HARSH the comment was b\c that would push me to do better like yo you gotta step it up.For example Bstyles and Simon I would show them pics of my route or whatever and they would be like the tracks are shitty and all and they would like me to GREAT stuff.So its a good thing.But I agree that the benches shouldn't be part of a station(spline) I mean on 1 platform theres about 2-4 benches maybe more in bigger stations.But ALL of US appreciate everything and we're just trynna point out things to make it better.I mean for example putting a garbage pale/can or benches in a spline won't be good its unrealistic in the real world.But WE all love and appreciate what you guys are doing.And I promise I WILL use your content to the fullest.I won't care if you critized me.

  2. I'll be releasing them on Tuesday. The first version will be compatible from TRS2006 to TC. The next will be from TRS2009 and beyond. The third and fourth will be mirror versions of these, except they will be vintage-themed, as originally planned. After that, I will work on the el stations, and then the elevated pack will be completed.
    The entire el pack is it for tranz 2004

    Read what he wrote.And your spelling is getting better.:eek:

  3. Nice work Gren Eggs.Btw will you retexture the stations in different colors? or when they're released we will have to clone and reskin them ourselves? Also how will be be able to rename the signs if spline objects are not renameable?

    One more thing are you guys thinking about creating nameable signs so they can be placed on the spline stations? It can be like Magiclands nameable station sign but in brick tiles(in black) non-spline so it matches the wall.

  4. Well, it is April now; does anyone have a specific date when the award of the contract should be announced? Or has it been delayed again?

    Its usually in the Daily News paper.I remember last year I was reading the paper and saw the R-179 or R-188 bidding dates.

  5. More 23rd Street Station

    But what do you mean by this "But we need elevated exits instead of ones that lead undergroud"?:confused::confused::confused:

    Whats the point of street exits/entrances that go underground when in operation the T/O can't see it.But on elevated there is an exit leading to the mezz which everyone can use and see.

  6. What's wrong with ALSTOM? I'm not being sarcastic I just want to know why some of you guys don't like it and I'm not big on the propulsion systems.

    Every R-160 except 8843-9102(which are Siemens) are annoying with that Alstom Propulsion.I rather deal with the LOUD Bombs on the (2)(4)(5) which also have Alstom but it doesn't repeat itself.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.