-
Posts
5,069 -
Joined
-
Last visited
-
Days Won
146
Content Type
Profiles
Forums
Gallery
Downloads
Events
Blogs
Posts posted by Kamen Rider
-
-
I just spent three days working the N and Q lines as a conductor. 2 days on the N and one on the Q.
that is why I know this will not work, it will not make the system better. I have actually been a cog in this machine. I am not looking at numbers on a screen and thinking I know better.
also the M/V was and is a terrible idea because 6th Avenue and QB should not have to deal with 480’ trains. Sure, it’s “popular” but it’s also the first thing cut the moment something goes wrong. We’re making shuttle trips to Essex street by 8:30 every night and it’s not even going to run at all next week.
0 -
“Consensus among subway nerds”.
great, then we know to do the exact opposite since armchair consensus usually is the exact wrong thing to do.
rhe purposes of the SAS is not to help Broadway. The purpose is to run under Second Avenue. Broadway service on the SAS is secondary.
You all have this mindset that all the lines must be running at absolute maximum capacity… when we can’t do that. We don’t have enough people, enough cars, enough resources, to provide the levels of service you seem to think are required.nevermind this is not the service the riding public desires. Astoria does not want just the W (which, need I remind you, doesn’t actually exist) while ram rodding both the N and Q up to 96 is more service than the line needs and more of a risk.
0 -
would also like to remind everyone that H is taken.
Yes, you don't call the shuttle that, but we still do.
0 -
On 2/15/2023 at 4:11 PM, TDL said:
LIRR already has an abadoned branch line between Lower Montauk and Queens Plaza along Dutch Kills
I would hardly call that a "branch". it was a curve of track to connect the Lower Montauk to the freight yards at sunnyside Yard.
8 hours ago, ActiveCity said:The MTA should re-open the lower level of City Hall as a terminal station.
We use that as storage space, so that's a no.
0 -
46 minutes ago, Lawrence St said:
I’m sorry, but it amazes me how people have lived here for a while and still don’t know what a train is 😂😂😂
If I think (cause this was only last week), she might have said she wasn’t from around here.
all I know was she was misusing the emergency intercom and there was someone else at my window asking me a question.
0 -
they would be a lot more amicable to our situation if they had an angry mob breathing down their necks every time something goes wrong?
12-9 at Jay, I'm on the F. I get told we're going over Crosstown. I literally had at least one person angrily ask me "What do you mean we're going over the G train? What the heck is a G train?"
9 -
Why are we even still having this conversation? We’ve established the 211As are launching on 8th avenue and overall the fleet will only be assigned to CBTC equipped lines.
you guys can go on and on about the N, Q and W all you want, but the simple fact is they are not getting them because the Broadway line will not be getting CBTC in the near term.
how hard is that to understand?
17 -
8 hours ago, JustTheSIR said:
That’s why I said they should have made them interoperable
that's like demanding a Nintendo Switch have an NES cartridge slot.
it would serve no real purpose.
8 -
7 hours ago, Wallyhorse said:
While ridership may be lower, kids still have to get to school, and I would have scheduled this for whatever week they are off for Easter/Passover.
It’s President’s Day Week AKA Mid winter break. They’re not going to School.
0 -
the next B division job pick won't take effect until, like, june. So before anything else that would not solve the problem in and of itself.
1 -
18 hours ago, JustTheSIR said:
That's ether TGC 3 or TGC 4. TGC 1 and 2 are single units.
0 -
2 hours ago, Lawrence St said:
Your telling me all 1,000 cars are for 8th Ave?
I understand the point your making but that has nothing to do with what I said for the test train.
And why you say? Let’s see, Broadway is one of the busiest lines in the system in which the R211T would benefit. Or it could be Queens Blvd. Or CPW. Point is, it’s to see where the train can handle better for the eventual placement when the entire order is delivered.
And no it wouldn’t, have two crews qualified to operate the train on each line. They’ve done it before to do clearance testing they can do it again.
1 hour ago, Lawrence St said:That’s BS. They can add any CBTC equippment to any NTT stock. 8th Ave does not “need” the R211’s because of CBTC. It can get the R143, R160, or R179.
And once again my little employee butt is ignored because some people seem to think they know better than me... seriously, when do I get that little profile badge next to my PFP...?
What I said was "to expand CBTC capacity to allow for the 8th avenue CBTC install".What that means is ALL the trains that run on the A,B,C and D need to be CBTC compatible. as of the current information I have on hand, there are roughly 87 non CBTC compliant trains running on those four routes in the AM rush. add the Rockaway Park Shuttle, since it draws from the same fleet, we're into 89-ish. THEN add spare factor, and we're getting quite close to 100 trains. 100 trains, times 10 cars, is 1000, obviously...
As for Broadway, it is busy... yes... but Broadway ISN'T getting CBTC any time soon. It will be getting the R68/As. There is no point in seeing where the 211s operate "better", it will be sent to operate WHERE IT IS NEEDED, which is on lines with CBTC territory. Yes, some 211s could be sent to Queens Blvd in the future, but that is not where they're going NOW.
Now... you seem to be mistaking just driving the train around with the clearance testing with actually operating the train in service.
Just two crews? First off, what happens when one crew member has to call out sick.
And secondly, we don't spend all day on the same trains.
You would need to have at least THREE qualified crews on hand at all times the train is operating. One at each terminal and one actually on the train.
that assumes the trains end up at the correct terminals every time. I've been rerouted before. I've been sent to other terminals and have had to work my way back. I've had trips dropped. I once worked a W sent up Second Avenue because of a very large gap in Q service. I've been turned for service in the opposite direction mid trip because something has gone wrong.
What I'm trying to say here is there is a logistical complexity to this that you don't seem to grasp..
9 -
4 hours ago, Lawrence St said:
How does it serve no purpose? If it shows that it works better on the then the as the original idea, that would benefit the system, not throw it into chaos.
Okay.. first off… the R211s are to expand the CBTC capable fleet for the 8th avenue CBTC installation…
why the $&@€£¥ would we put them on the N, a line not getting CBTC any time soon?
secondly. Crews need to be qualified on new equipment. There are new features and details on the 211s that even we are not aware of yet, let alone you guys.
testing them on every line requires every line to have qualified crews that can take the train at a moments notice or have a dedicated crew that follows the train from line to line.
the chaos comes in because this idea would interfere with the crew assignments because, again, you’re tossing in a train not everyone knows how to handle.
7 -
This serves no purpose and throws the pick system into chaos.
0 -
Crew qualification needs means that’s difficult if not impossible, unless you have a small handful of crews who jump from line to line with the trains for the first few months until enough crews are ready.
0 -
Every last rider is worth bending over backwards for.
The entire reason we have the system is to provide people with mobility they might not otherwise have. To tell someone outright they don’t matter because of where they choose to live… that’s just all kinds of wrong.
we do not exist to be optimized and economical. We exist to provide a service to everyone who wants it.
if these people want us to be there, then we should be there.
5 -
Yes, because it’s one of the first of the “Customer Service Center” conversions.
0 -
i mean, they do use them on occasions as the H, so technically that's a yes, but as we've been saying, cars are doled out to service from the yard as needed. They could make it all R179s one day and all R46s the next.
0 -
31 minutes ago, trainfan22 said:
Also the MTA president said it's time for the cars to take a swim, the MTA president isn't aware that they went back to scrapping cars the old fashioned way? Unless plans changed. I doubt they will go back to reefing for R46 disposal as the stainless steel reef program didn't age as well as it did with the Redbirds.
you do know what a "joke" is, right? Jokes don't have to be factual.
0 -
The T sets aren't going to enter service till the fall.
1 -
13 minutes ago, starwind said:
Does anyone know how to disable the intercom in the 62/62A's? The static is driving me crazy.
couple things... firstly, this a thread talking about the R262s, the planned replacement for the R62.
Secondly, I would not go around admitting on a public forum that anyone can read that you want to intentionally disable the IC.
6 -
There are two factors here that you need to remember.
1: the system was designed to be interlined. Core capacity is dependent on there being multiple routes, because the terminals do not actually meet the needs to turn back enough trains quick enough.
2: Ridership wants and needs don't line up with what makes sense to you on paper. Take ANY service away from Astoria and the locals WILL riot. They don't want just Broadway locals. They want an express. It might not seem like it, but there is logic behind these service patterns.
0 -
said it before, say it again...
the reason for the local via 53rd is to connect the local stations on the corridor to the G. under these sorts of plans, you have to take extra transfer to the E or F.
0 -
2 hours ago, 1998NewFlyer said:
So Concourse's yard capacity and if it can hold the B fleet is related to the r211 how?
…because there are people who think the entire option 1 R211 delivery can be sent to Concourse and maintained for the D and B.
this is about the potential reassignments as the new cars come online. It’s all tangentially connected in some way.
0
Second Avenue Subway Discussion
in New York City Subway
Posted
If I've told you once, I've told you a million times that is not practical.