No. Once again, to facilitate maximum possible service on the / / during the shutdown, all SMEEs are coming off the Jamaica El lines. It is statistical fact that NTTs have a faster run time (compared to SMEEs) over the Williamsburg Bridge, which is the bottleneck along that line, therefore, making Jamaica El services 100% NTT will allow for maximum passenger capacity on lines that will desperately need the capacity once the L shuts down in Manhattan.